10
D. With vehicle hardtop centered left to right drop a plumb line from mounting board to rest at each side of vehicle.
Mark ceiling mounting board plumb line with pencil. Pigtail lag bolts to be mounted 2” outbound from plumb line
mark. Move vehicle back out of garage before drilling.
E. Measure 2” outbound from plumb lines for correct mounting board location.
Содержание Quadratop 12020-2000
Страница 20: ...Instructions Part 12999 3307...