September 26, 2016
7037-172
21
4300 Wood Appliance Series ACC
Figure 21.1
Figure 21.2
6. Remove knock out from bottom of firebox by using a
hammer
(Figure 18.2 on page 18)
.
7. Install ash door assembly by sliding the rod at an angle
into the slot on the left side
(Figure 18.3 on page 18)
.
8. Slide the ash door over the 8 screws protruding from the
bottom of the appliance. Secure with nuts and washers
using 7/16 socket wrench
(Figure 18.3 on page 18).
9. Install ARS latch by sliding latch assembly over 2 threaded
studs protruding from the bottom on the left hand side of
the appliance. Secure by using two nuts use 7/16 socket
wrench
(Figure 19.1 on page 19)
.
10.Add knob to handle rod (
Figure 19.2 on page 19).
11.
Use 2 bolts and two flange nuts to secure ARS chan
-
nel using 3/8 open end wrench and 7/16 socket wrench
(Figure 19.3 on page 19)
.
Installing Queen Anne Leg ARS Kit
1. Follow Beginning installing the ARS system instructions
provided on page 20.
2. Install ARS Spacer on left hand side with one bolt using
phillips head screwdriver
(Figure 19.4 on page 19).
3. Install leg brackets and ash drawer using four screws using
phillips head screwdriver.
• Start bottom two bolts through ash drawer, leg brackets
and into the bottom of the appliance
(Figure 21.1)
.
• Align top holes and repeat; secure all four bolts.
4. Install legs onto leg brackets making sure the legs are up
against the bracket and secure with bolts and washers
using a 3/8 open end wrench
(Figure 21.2)
.
5. Install leveling bolts into 2 legs; these leveling legs should
be in opposite corners
(Figure 21.2)
.
6. Carefully stand stove up and place in desired location.
7. Use leveling bolts on legs to stabilize and level stove
(Figure 21.3)
.
Finishing the ARS Installation
1. Replace 2 front bricks that were removed
(Figure 21.4)
.
2. Install the ash drawer to ASH Removal receiver.
3. Install ARS access cover inside of ARS Channel that is
located inside the firebox
(Figure 21.4)
.
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
• Verify that the baffle boards and ceramic blanket are
in their proper locations.
• It is important that the baffle boards and ceramic
blanket are correctly installed for proper burn safety.
Caution!
Figure 21.3
Lay appliance flat on
its back on protective
padding or pallet
Ash Removal Box
Leg Brackets
Insert 2 bottom screws loosely
Align top holes
and repeat; secure
Leveling Legs at
Opposite Corners
Ash Drawer
ARS Access
Cover
Reinstall 2 front
bricks back into
firebox
Figure 21.4