24
INSTALLATION INSTRUCTIONS
ZZ
AAA
BBB
CCC
57.
Repeat step 56 for the remaining 5 or 3 holes (
ZZ
).
Make sure 2 to 3 threads of the 3/8” bolts are sticking out
after they are secured with the lock nuts.
MOUNTING THE STABILIZER
(ADVANCED STABILIZER GO TO STEP 64)
A Stabilizer MUST be installed with the QLK-150
Wheelchair Docking System if this System is being used
for a driver application and recommended for all other
applications. Inspect the underside of vehicle floor, note
utilities, frames, cross-members, fuel tanks and other
possible obstructions.
58.
Place the wheelchair (without occupant) on top of the Docking
System. Move wheelchair forward and engage the 5/8”
(15.88mm) Docking Bolt into the Docking System (
AAA
).
59.
Line up the mounting holes from the Stabilizer with the ones
marked on the vehicle floor. Insert the Stabilizer into the
V-Guide. Make sure the Stabilizer is levelled and parallel with
the vehicle floor (
BBB
).
Remove Stabilizer before drilling holes.
60.
Drill 4 downward holes where Stabilizer was marked (
CCC)
.
Levelled and Parallel
Remove Stabilizer Before Drilling Holes