7
SECTION 1
–
INSTALLATION
INSPECTION
Prior to installing the Ultrasonic Processor, perform a visual inspection to detect any
evidence of damage, which might have occurred during shipment. Before disposing of
any packaging material, check it carefully for small items.
The equipment was thoroughly inspected and carefully packed before leaving our
factory. The carrier, upon acceptance of the shipment, assumed responsibility for its safe
delivery. Claims for loss or damage sustained in transit must be submitted to the carrier.
If damage has occurred, contact your carrier within 48 hours of the delivery date. DO
NOT OPERATE DAMAGED EQUIPMENT. Retain all packing materials for future
shipment.
ELECTRICAL REQUIREMENTS
The Ultrasonic Processor requires a fused, single phase 3-terminal grounding type
electrical outlet capable of supplying
230 +/- 10% VAC, 50/60 Hz, 20 amps.
If the desired plug type is different for your country or region see page 41 for a wiring
diagram and consult an electrician.
INSTALLING THE ULTRASONIC PROCESSOR
The ultrasonic processor should be installed in an area that is free from excessive dust,
dirt, explosive and corrosive fumes, and extremes of temperature and humidity. If
processing flammable liquids, use an approved fume hood and do not place the power
supply in the fume hood.
Unit shall be placed on a flat clean level surface. The mounting feet shall not be
removed from the bottom of the unit. The unit vents through the holes in the chassis
located on the underside of the unit. Keep this area clear of debris and dust.
When positioning the unit, be sure to leave adequate space behind the unit so that all
connections can be easily disconnected.
Verify the fan on the rear of the unit is rotating
and operational.
WARNING
For your personal safety, do not, under
any circumstances, defeat the grounding
feature of the power cord by removing the
grounding prong.
6
Содержание CT2000
Страница 30: ...41 Wiring Diagram 30...