AP-3 Manual
Table of Contents
Revision 3 - April, 2009
Page v
Figures:
Figure 1 - ATEX Label Detail, Example and Explanation ................................ 2
Figure 2 - AP-3 ATEX Label Location and Appearance ................................... 3
Figure 3 - How it Works..................................................................................... 9
Figure 4 - Overview of the AutoPump System.................................................. 11
Figure 5 - Long and Short Bottom-Loading (AP-3/BL)................................... 16
Figure 6 - Long and Short Top-Loading (AP-3/TL).......................................... 17
Figure 7 - Long and Short AP-3 Bottom Loading with Leachate Screen.......... 19
Figure 8 - Short AP-3 Top Loading with Optional Brass “WYE” Fitting ......... 20
Figure 9 - Short AP-3/TLC and Short AP-3/TL Comparison............................ 21
Figure 10 - Long AP-3/TLC and Long AP-3/TL Comparison ............................ 22
Figure 11 - Single Stage Filter/Regulator 60 with Quick-Connects ................... 23
Figure 12 - Locking Quick-Connects .................................................................. 28
Figure 13 - Two-Ear Clamp and Hose Barb Assembly Instructions.................... 29
Figure 14 - Worm Drive Clamp and Hose Barb Assembly Instructions.............. 30
Figure 15 - AP-3 Assembly: Well Cap with Holes .............................................. 31
Figure 16 - AP-3 Assembly: Well Cap with Hose Barbs..................................... 32
Figure 17 - Examples of Well Caps ..................................................................... 35
Figure 18 - Hose Bundling: Part 1 of 2................................................................ 37
Figure 19 - Hose Bundling: Part 2 of 2................................................................ 38
Figure 20 - Removing AP-3 Pump Casing .......................................................... 48
Figure 21 - Internal View of a Bottom-Loading and Top-Loading AP-3............. 50
Figure 22 - Exploded View of a Top-Loading Long AP-3................................... 51
Figure 23 - Exploded View of a Bottom-Loading (Long & Short)...................... 52
Содержание AutoPump AP-3
Страница 11: ...QED Environmental Systems AP 3 Manual Page 2 Figure 1 ATEX Label Detail Example and Explanation...
Страница 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Страница 20: ...Page 11 AP 3 Manual Revision 3 April 2009 Figure 4 Overview of the AutoPump System Chapter 2 Overview...
Страница 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Страница 26: ...Page 17 AP 3 Manual Revision 3 April 2009 Figure 6 Long and Short Top Loading AP 3 TL Chapter 3 Equipment...
Страница 29: ...QED Environmental Systems AP 3 Manual Page 20 Figure 8 Short AP 3 Top Loading with Optional Brass WYE Fitting...
Страница 31: ...QED Environmental Systems AP 3 Manual Page 22 Figure 10 Long AP 3 TLC and Long AP 3 TL Comparison...
Страница 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Страница 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Страница 44: ...Page 35 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 17 Examples of Well Caps...
Страница 46: ...Page 37 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 18 Hose Bundling Part 1 of 2...
Страница 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Страница 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Страница 59: ...QED Environmental Systems AP 3 Manual Page 50 Figure 21 Internal View of a Bottom Loading and Top Loading AP 3...
Страница 61: ...QED Environmental Systems AP 3 Manual Page 52 Figure 23 Exploded View of a Bottom Loading Long Short...
Страница 62: ...Page 53 AP 3 Manual Revision 3 April 2009 Chapter 6 Maintenance Figure 24 Exploded View of AP 3 Lever Assembly...
Страница 63: ...QED Environmental Systems AP 3 Manual Page 54 Figure 25 Exploded View of a Top Loading Short AP 3...
Страница 104: ...Appendix C Conversions Page 95 Revision 3 April 2009 AP 3 Manual Figure 51 Conversion from Top Loading to Bottom Loading...
Страница 111: ...QED Environmental Systems AP 3 Manual Page 102 Figure 55 AP 3 BL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 113: ...QED Environmental Systems AP 3 Manual Page 104 Figure 57 AP 3 TL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...