QED Environmental Systems
AP-3 Manual
Page 34
STEP 3 -
Tip the top of the pump downwards to about 45°. The float should slide to
the top of the pump and open the air valve. Air should be heard going into
the pump. It will exit the inlet fluid check valve (Bottom-loading) or the
outlet check valve (Top-loading).
Caution:
If air is not acceptable in the fluid discharge hose, disconnect the hose before
performing this test.
STEP 4 -
Tip the head of the pump upwards past horizontal to 45° from the vertical.
The float should slide to the bottom of the pump and close the air valve.
STEP 5 -
Repeat this process 3 or 4 times to ensure the float moves freely and the
air-valve opens and closes. If the pump must be tilted nearly vertical
before the float slide or the air valve moves, open the pump and inspect
for interference.
Pump Support System and Hose Bundling Assembly
A pump support system can be created to support the pump and hoses. The pump support
system uses well caps with various fitting combinations.
(See Figure 15)
Though it is possible in some instances to support a downwell pump with only the tubing, a
separate support line is recommended.
Note:
The walls of some wells deform over time. They may trap a downwell
pump. In some of those cases the support line has proven useful when
retrieving the pump.
In addition to supporting the down-well equipment with a support rope, it may be important
to support down-well hoses (in most cases nylon tubing does not need to be supported by the
support line). Since the down-well hoses can weigh more than the pump, particularly in wells
over 50 feet deep with fluid inside the discharge hose, hose support can avoid problems such
as kinking, jamming, and breaking.
Содержание AutoPump AP-3
Страница 11: ...QED Environmental Systems AP 3 Manual Page 2 Figure 1 ATEX Label Detail Example and Explanation...
Страница 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Страница 20: ...Page 11 AP 3 Manual Revision 3 April 2009 Figure 4 Overview of the AutoPump System Chapter 2 Overview...
Страница 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Страница 26: ...Page 17 AP 3 Manual Revision 3 April 2009 Figure 6 Long and Short Top Loading AP 3 TL Chapter 3 Equipment...
Страница 29: ...QED Environmental Systems AP 3 Manual Page 20 Figure 8 Short AP 3 Top Loading with Optional Brass WYE Fitting...
Страница 31: ...QED Environmental Systems AP 3 Manual Page 22 Figure 10 Long AP 3 TLC and Long AP 3 TL Comparison...
Страница 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Страница 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Страница 44: ...Page 35 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 17 Examples of Well Caps...
Страница 46: ...Page 37 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 18 Hose Bundling Part 1 of 2...
Страница 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Страница 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Страница 59: ...QED Environmental Systems AP 3 Manual Page 50 Figure 21 Internal View of a Bottom Loading and Top Loading AP 3...
Страница 61: ...QED Environmental Systems AP 3 Manual Page 52 Figure 23 Exploded View of a Bottom Loading Long Short...
Страница 62: ...Page 53 AP 3 Manual Revision 3 April 2009 Chapter 6 Maintenance Figure 24 Exploded View of AP 3 Lever Assembly...
Страница 63: ...QED Environmental Systems AP 3 Manual Page 54 Figure 25 Exploded View of a Top Loading Short AP 3...
Страница 104: ...Appendix C Conversions Page 95 Revision 3 April 2009 AP 3 Manual Figure 51 Conversion from Top Loading to Bottom Loading...
Страница 111: ...QED Environmental Systems AP 3 Manual Page 102 Figure 55 AP 3 BL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 113: ...QED Environmental Systems AP 3 Manual Page 104 Figure 57 AP 3 TL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...