QED Environmental Systems
AP-3 Manual
Page 4
How to Contact
QED
If for any reason you are unable to find what you need in this manual please feel free to
contact the
QED
Service Department at any time. We encourage you to use following
communication methods to reach us at any time:
Service Department
QED Environmental Systems
www.qedenv.com
San Leandro Service Center
1565 Alvarado Street
San Leandro, California 94577-2640
(800) 537-1767 — North America Only
(510) 346-0400 — Tele.
(510) 346-0414 — Fax
Ann Arbor Service Center
PO Box 3726
6095 Jackson Road
Ann Arbor, Michigan 48106-3726
(800) 624-2026 — North America Only
(734) 995-2547 — Tele.
(734) 995-1170 — Fax
info@qeden
v.com — E-mail
QED
can be reached 24 hours a day
We welcome your comments and encourage your feedback regarding anything in this
manual and the equipment you have on-site.
Thank you again for specifying
QED
remediation equipment.
Содержание AutoPump AP-3
Страница 11: ...QED Environmental Systems AP 3 Manual Page 2 Figure 1 ATEX Label Detail Example and Explanation...
Страница 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Страница 20: ...Page 11 AP 3 Manual Revision 3 April 2009 Figure 4 Overview of the AutoPump System Chapter 2 Overview...
Страница 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Страница 26: ...Page 17 AP 3 Manual Revision 3 April 2009 Figure 6 Long and Short Top Loading AP 3 TL Chapter 3 Equipment...
Страница 29: ...QED Environmental Systems AP 3 Manual Page 20 Figure 8 Short AP 3 Top Loading with Optional Brass WYE Fitting...
Страница 31: ...QED Environmental Systems AP 3 Manual Page 22 Figure 10 Long AP 3 TLC and Long AP 3 TL Comparison...
Страница 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Страница 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Страница 44: ...Page 35 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 17 Examples of Well Caps...
Страница 46: ...Page 37 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 18 Hose Bundling Part 1 of 2...
Страница 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Страница 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Страница 59: ...QED Environmental Systems AP 3 Manual Page 50 Figure 21 Internal View of a Bottom Loading and Top Loading AP 3...
Страница 61: ...QED Environmental Systems AP 3 Manual Page 52 Figure 23 Exploded View of a Bottom Loading Long Short...
Страница 62: ...Page 53 AP 3 Manual Revision 3 April 2009 Chapter 6 Maintenance Figure 24 Exploded View of AP 3 Lever Assembly...
Страница 63: ...QED Environmental Systems AP 3 Manual Page 54 Figure 25 Exploded View of a Top Loading Short AP 3...
Страница 104: ...Appendix C Conversions Page 95 Revision 3 April 2009 AP 3 Manual Figure 51 Conversion from Top Loading to Bottom Loading...
Страница 111: ...QED Environmental Systems AP 3 Manual Page 102 Figure 55 AP 3 BL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 113: ...QED Environmental Systems AP 3 Manual Page 104 Figure 57 AP 3 TL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...