Page 109
Revision 3 –April, 2009
AP-3 Manual
QED Environmental Systems
1565 Alvarado Street
San Leandro, California 94577-2640
USA
(800) 537-1767
Toll-Free in North America
(510) 346-0400
Tele.
(510) 346-0414
Fax
5. Equipment must be cleaned before shipment or it will be cleaned by QED before any
work is performed. The customer will be charged for such cleaning.
If any product covered hereby is actually defective within the terms of this warranty,
purchaser must contact QED, or its appointed agent, for determination of warranty coverage.
If the return of a component is determined to be necessary, QED, or its appointed agent, will
authorize the return of the component at Purchasers expense. If the product proves not to be
defective within the terms of this warranty, then all costs and expenses in connection with
the processing of the Purchaser’s claim and all costs for repair, parts, labor, and shipping and
handling, as authorized by owner hereunder, shall be borne by the Purchaser. In no event
shall such allegedly defective products be returned to QED, or its appointed agent, without
its consent, and QED’s, or its appointed agent’s, obligations of repair, replacement or refund
are conditional upon the buyer’s return of the defective product to QED, or its appointed
agent. All equipment returned to QED will be appropriately cleaned of contamination before
shipping.
Terms, Conditions, and Warranty
Содержание AutoPump AP-3
Страница 11: ...QED Environmental Systems AP 3 Manual Page 2 Figure 1 ATEX Label Detail Example and Explanation...
Страница 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Страница 20: ...Page 11 AP 3 Manual Revision 3 April 2009 Figure 4 Overview of the AutoPump System Chapter 2 Overview...
Страница 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Страница 26: ...Page 17 AP 3 Manual Revision 3 April 2009 Figure 6 Long and Short Top Loading AP 3 TL Chapter 3 Equipment...
Страница 29: ...QED Environmental Systems AP 3 Manual Page 20 Figure 8 Short AP 3 Top Loading with Optional Brass WYE Fitting...
Страница 31: ...QED Environmental Systems AP 3 Manual Page 22 Figure 10 Long AP 3 TLC and Long AP 3 TL Comparison...
Страница 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Страница 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Страница 44: ...Page 35 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 17 Examples of Well Caps...
Страница 46: ...Page 37 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 18 Hose Bundling Part 1 of 2...
Страница 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Страница 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Страница 59: ...QED Environmental Systems AP 3 Manual Page 50 Figure 21 Internal View of a Bottom Loading and Top Loading AP 3...
Страница 61: ...QED Environmental Systems AP 3 Manual Page 52 Figure 23 Exploded View of a Bottom Loading Long Short...
Страница 62: ...Page 53 AP 3 Manual Revision 3 April 2009 Chapter 6 Maintenance Figure 24 Exploded View of AP 3 Lever Assembly...
Страница 63: ...QED Environmental Systems AP 3 Manual Page 54 Figure 25 Exploded View of a Top Loading Short AP 3...
Страница 104: ...Appendix C Conversions Page 95 Revision 3 April 2009 AP 3 Manual Figure 51 Conversion from Top Loading to Bottom Loading...
Страница 111: ...QED Environmental Systems AP 3 Manual Page 102 Figure 55 AP 3 BL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 113: ...QED Environmental Systems AP 3 Manual Page 104 Figure 57 AP 3 TL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...