QED Environmental Systems
AP-3 Manual
Page 66
Example:
A long Bottom-Loading AP-3 with a 1-inch discharge hose and 70 psi supply
pressure positioned 100 feet below ground and submerged 6 inches below the fluid will
produce about 3.0 gallons per minute (GPM).
The same pump submerged 10 feet below the fluid produces 3.8 GPM.
Note:
These flow rates are only applicable for the designated well head conditions.
Any additional resistance from out-of-well equipment (e.g. surface hoses,
valves, etc.) will affect the values
shown on these curves.
With the previous information, obtain the flow rate by using the following steps:
• On the horizontal scale, find the depth in the well at which the pump will be located.
• Trace that depth upwards to the line for the air inlet pressure you selected.
• Travel horizontally over to the vertical scale and read the flow rate.
Содержание AutoPump AP-3
Страница 11: ...QED Environmental Systems AP 3 Manual Page 2 Figure 1 ATEX Label Detail Example and Explanation...
Страница 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Страница 20: ...Page 11 AP 3 Manual Revision 3 April 2009 Figure 4 Overview of the AutoPump System Chapter 2 Overview...
Страница 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Страница 26: ...Page 17 AP 3 Manual Revision 3 April 2009 Figure 6 Long and Short Top Loading AP 3 TL Chapter 3 Equipment...
Страница 29: ...QED Environmental Systems AP 3 Manual Page 20 Figure 8 Short AP 3 Top Loading with Optional Brass WYE Fitting...
Страница 31: ...QED Environmental Systems AP 3 Manual Page 22 Figure 10 Long AP 3 TLC and Long AP 3 TL Comparison...
Страница 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Страница 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Страница 44: ...Page 35 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 17 Examples of Well Caps...
Страница 46: ...Page 37 AP 3 Manual Revision 3 April 2009 Chapter 4 Assembly Installation Figure 18 Hose Bundling Part 1 of 2...
Страница 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Страница 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Страница 59: ...QED Environmental Systems AP 3 Manual Page 50 Figure 21 Internal View of a Bottom Loading and Top Loading AP 3...
Страница 61: ...QED Environmental Systems AP 3 Manual Page 52 Figure 23 Exploded View of a Bottom Loading Long Short...
Страница 62: ...Page 53 AP 3 Manual Revision 3 April 2009 Chapter 6 Maintenance Figure 24 Exploded View of AP 3 Lever Assembly...
Страница 63: ...QED Environmental Systems AP 3 Manual Page 54 Figure 25 Exploded View of a Top Loading Short AP 3...
Страница 104: ...Appendix C Conversions Page 95 Revision 3 April 2009 AP 3 Manual Figure 51 Conversion from Top Loading to Bottom Loading...
Страница 111: ...QED Environmental Systems AP 3 Manual Page 102 Figure 55 AP 3 BL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 113: ...QED Environmental Systems AP 3 Manual Page 104 Figure 57 AP 3 TL with Vacuum In the Well and Pump Exhaust In the Well...
Страница 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...