INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.TRON(BLK) M-G2.X
9
6 CLAMPS ON LONG SIDE &
3 CONTINUOUS RAILS PARALLEL TO SHORT SIDE
6 CLAMPS ON LONG SIDE (SHORT RAILS ALLOWED)
CL6a
EN
CL6b
S
L
CL6a
L1
L1
L2
CL6c
EN
CL6c
CL6d
20 - 250
560 - 1160
L1
15
-
110
L1
L2
POSITION OF
CLAMPS* [mm]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
POSITION OF
CLAMPS* [mm]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
L1
20 - 350
8100 / 4000
5400 / 2665
L1
20 - 350
3200 / 3200
2130 / 2130
L2
561 - 1161
L2
661 - 1061
CL6a
Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the
module and substructure).
CL6c
Short mounting rails are permissible, if they overlap with the module less than 110 mm. Maintain a minimum
distance (clearance) of ≥ 40 mm between frame bottom edge and roof top or ballast.
Minimum support depth of 15 mm is required on the back side of the module.
2 CLAMPS ON LONG SIDE, 4 CLAMPS ON SHORT SIDE
CL6d
EN
CL6c
CL6d
S
L
L1
L1
L2
POSITION OF
CLAMPS* [mm]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
S
20 - 200
3600 / 3600
2400 / 2400
L
661 - 1061
CL6d
Short mounting rails are permissible, if they overlap with the module less than 110 mm. Maintain a minimum
distance (clearance) of ≥ 30 mm between frame bottom edge and roof top or ballast.
Minimum support depth of 15 mm is required on the back side of the module.
*
Distance between outer edge of module and middle of the clamp.
2 Planning
2.3 Mounting options