background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.TRON (BLK) M-G2.X

8

2 Planning

2.3 Mounting options

4 CLAMPS ON SHORT SIDE &

2 CONTINUOUS RAILS PARALLEL TO LONG SIDE

4 CLAMPS ON SHORT SIDE

CL2a

CL2a

CL2b

S

S

S

S

CL2b

CL2a

CL2b

S

S

S

S

POSITION OF 

CLAMPS* [mm]

TEST LOAD 

PUSH / PULL [Pa]

DESIGN LOAD 

PUSH / PULL [Pa]

POSITION OF 

CLAMPS* [mm]

TEST LOAD 

PUSH / PULL [Pa]

DESIGN LOAD 

PUSH / PULL [Pa]

S

20 - 130**

3600 / 2400

2400 / 1600

S

20 - 200

2400 / 2400

1600 / 1600

20 - 350**

3600 / 2000

2400 / 1330

CL2a

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 

module and substructure).

CL2b

  Minimum support depth of 15 mm is required on the back side of the module.

  Short mounting rails are permissible, if they overlap with the module less than 110 mm. Maintain a minimum 

distance (clearance) of ≥ 70 mm between frame bottom edge and roof top or ballast.

4 CLAMPS ON LONG SIDE & 

2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS

2 CLAMPS ON LONG SIDE, 2 CLAMPS ON SHORT SIDE 

CL3

CL3

CL4

300 - 550

0 - 300

0 - 300

CL3

CL4

CL4

0 - 200

ROW

CL3

300 - 550

L

CL5

EUROPE

CL5

L

S

POSITION OF 

CLAMPS* [mm]

TEST LOAD 

PUSH / PULL [Pa]

DESIGN LOAD 

PUSH / PULL [Pa]

POSITION OF 

CLAMPS* [mm]

TEST LOAD 

PUSH / PULL [Pa]

DESIGN LOAD 

PUSH / PULL [Pa]

L

200 - 350

4000 / 3600

2660 / 2400

S

20 - 100

3200 / 3200

2130 / 2130

L

300 - 450

CL3

  Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 

module and  substructure).

  Minimum support depth of 15 mm is required on the back side of the module.

CL5

  Minimum required support depth on the module backside is 10 mm on long frame side and 15 mm on short 

frame side.

*

**

Distance between outer edge of module and middle of the clamp.

Rails must not be under the junction box.

Содержание Q.TRON M-G2.X Series

Страница 1: ...Installation and operation manual Q TRON BLK M G2 X solar module series...

Страница 2: ...e was manufactured apply to the installation mounting and maintenance procedures for the respective solar modules as far as no updated document is provided 1 Introduction 3 2 Planning 5 2 1 Technical...

Страница 3: ...Attention Risk of serious injury or damage to property Note Risk of damage to product Safety Regulations In particular the installer as well as the operator of a module is responsible for compliance w...

Страница 4: ...em supplier for information concerning the formal requirements for solar power systems Please be sure to contact the relevant local authorities and energy providers regarding regulations and permit re...

Страница 5: ...tection class IP67 with bypass diode Connector protection class IP68 Fire rating based on ANSI UL 61730 C Type 2 Max test load Push Pull1 8 100Pa 4 000Pa Max design load Push Pull1 5 400Pa 2 660Pa Cer...

Страница 6: ...uch as buildings chimneys or trees Avoid partial shading for example through overhead lines dirt snow Mounting Structure Requirements The Modules shall be installed and operated on mounting struc ture...

Страница 7: ...ed by technical measures Loads according to IEC 61215 2 2016 and UL 61730 2 2017 except for design loads lower than 1600 Pa which do not fulfill the requirements of the standards The test procedure is...

Страница 8: ...s than 110mm Maintain a minimum distance clearance of 70mm between frame bottom edge and roof top or ballast 4 CLAMPS ON LONG SIDE 2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS 2 CLAMPS ON LONG SIDE...

Страница 9: ...ructure CL6c Short mounting rails are permissible if they overlap with the module less than 110mm Maintain a minimum distance clearance of 40mm between frame bottom edge and roof top or ballast Minimu...

Страница 10: ...il of the substructure no spacer allowed between the module and substructure Use M8 corrosion proof screws and washers diameter 15 8mm for mounting slots Detail A Fig 1 Mounting screws and washers sho...

Страница 11: ...nstalled Take into account all possible operating situations and all relevant technical norms and regulations when designing the system It has to be ensured that the maximum system voltage including a...

Страница 12: ...act the transport company regarding any damage to the packaging and follow their instructions Follow any instructions on the packaging Ensure that all personnel are aware of and adhere to accident pre...

Страница 13: ...ioning systems Note Module damage may occur Do not drop modules Note Module damage may occur Only make modifications to the module which have been confirmed in writing by Qcells confirmation letter No...

Страница 14: ...fatal injury due to electric shock Ensure that modules and tools are not subject to moisture or rain at any time during installation Warning Risk of injury due to falling modules Secure modules during...

Страница 15: ...interval of at least 10mm between two modules along the short side and 5mm along the long side 10 mm 5 m m EU Note Module damage may occur Do not subject modules to mechanical tension Max torsion 10m...

Страница 16: ...safety guide lines for the installation of electrical devices and systems Please make sure to take all necessary safety precautions With module or phase voltages of more than 120V the safety extra low...

Страница 17: ...of fatal injury due to electric shock Never plug or unplug the cable when under load Modules must not carry any current 1 Switch off the inverter OFF EN 2 Switch off the DC circuit breaker 3 Measure s...

Страница 18: ...nections Note Module damage may occur Ensure that the cabling is not under mechanical stress Comply with bending radius of 60mm Ensure that the cables do not run between module and mounting rail or st...

Страница 19: ...ds Note Module damage may occur Ensure that the plug connections are secured away from any water channelling surface Integrate the system into the existing lightening protection system in accordance w...

Страница 20: ...cts Danger Risk of fatal injury due to electric shock Do not attempt to fix any problems yourself e g glass cracks damaged cables Please contact an installer or Qcells Technical Customer Service Depar...

Страница 21: ...y without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking into account all rele vant safety...

Страница 22: ...tion manual solar modules Q TRON_M G2 X_modules_series_2023 07_Rev02_EN Hanwha Q CELLS GmbH OT Thalheim Sonnenallee 17 21 06766 Bitterfeld Wolfen Germany EMAIL WEB TEL FAX sales qcells com www qcells...

Отзывы: