Nixie Tube Clock ‘Elite’
Issue 3 (25 July 2018)
www.pvelectronics.co.uk
- 17 -
5.3 Testing Low Voltage Power Supply.
Identify the test GND, 5V and HV test points at the side of the PCB.
Plug in the 12V DC power supply, and then test using a DC
voltmeter: Touch the black probe on the GND test point and the
red probe on the 5V test point. The voltage should measure
between 5.6 and 5.9 Volts. If not, disconnect power and check
your work. Do not proceed with the assembly until the error is
corrected. Once the test is completed, disconnect the power.
5.4 High Voltage Generator components.
Socket for IC2
R1, R3 (4.7 KΩ)
R2 (390 KΩ)
C3 (1uF)
C4 (220uF)
D4 (1N5819)
D5 (UF4004)
Q1 (IRFD220)
L2 (100uH Inductor)