T•FOLD
User Guide
Page 27
3.
Initial Setup & Basic Operations
3.1
Introduction
This chapter provides information on the initial setup and basic operation of the PPS
T•FOLD
.
It is highly recommended that the initial setup of the
T•FOLD
be performed by a PPS trained &
authorized technician. Damage caused by incorrect setup will not be warrantied.
Initial setup should be undertaken in the following order:
1. Position the
T•FOLD
" p.29.
2. Remove packing materials
3.4.1 "Removal of Shipping Tape" p.31
.
3. Load garment for folding
3.5.4 "Preparing & Loading Garments for " p.34.
3.2
Before you Get Started
3.2.1
Get to Know your PPS
T•FOLD
Starting a new business or adding to your existing product line with the PPS
T•FOLD™ is a very
exciting, and potentially very profitable time. Don’t get too carried away
though, allow plenty of time
to become familiar with your
T•FOLD
and to learn not only the basics, but also the variables that can
impact on your finished product.
These variables include garment types, fabric types, your operating environment and garment
preparation. Thoroughly read this manual, ask questions of your PPS Technician or Distributor, talk to
other users (see various internet forums). Be realistic about deadlines when accepting orders and
allow yourself sufficient time to complete the order.
FIGURE 3-1 T-FOLD ORIENTATION
Front
Left
Upper
Rear
Right
Lower
Содержание T-FOLD
Страница 1: ......