34
BoardWalk Ramp and Platform Assembly Instructions
TOOLS REQUIRED - #3 PHILIPS SCREW DRIVER, 3/16" HEX KEY, 3/8" SOCKET, 1/2” WRENCH,
LEVEL, 7/16” WRENCH, 5/16” WRENCH, IMPACT DRIVER/DRILL, T27 DRIVER BIT (PROVIDED)
FIVE SECTION
BOARDWALK SYSTEM
WITH ONE SECTION OF HANRAILS
FIVE SECTION BOARDWALK SYSTEM
PARTS NEEDED FOR FIVE SECTION BOARDWALK SYSTEM
CONFIGURATION #4
Assembly #1
Standard BoardWalk
Sections
Quantity - 3
Assembly #4
Top Section with
Approach Plate
Quantity - 1
Part A.
BoardWalk Paltform
Quantity - 1
Part H.*
Nut (Strap Clamps)
Quantity - 16
Part I.*
Locking Washer
(Strap Clamps)
Quantity - 16
Part G.*
Strap Clamp
Quantity - 8
Part F.*
Square-Necked
Carriage Bolt
Quantity - 16
Part L.
Bolt
(Approach Plate)
Quantity - 16
Part M.
Movable Gray Curb
Quantity - 1
Assembly #3
Approach Plate
Assembly
Quantity - 1
Part E.
Collar Clamp
Quantity - 4
Part J.
Washer
(Approach Plate)
Quantity - 16
Part K.
Nut
(Approach Plate)
Quantity - 16
*Pre-assembled on Platform
Part C.
Jack Screw
Quantity - 4
Part D.
Jack Screws
Quantity - 4
Jack Screw Assembly
Assembly #6
Attachment-Ready
Section with Handrail Uprights
Quantity - 1
Part B.
Jack Tube Upright
for Handrails
Quantity - 2
Part P.
90 Degree
Fitting
Quantity - 4
Part S.
T-Fitting
Quantity - 1
Part R.
Adjustable Elbow
Fitting
Quantity - 4
Part Q.
90 Degree
Threeway Fitting
Quantity - 1
Part T.
51.5” Handrail Pipe
Quantity - 1
Part U.
63.75” Handrail Pipe
Quantity - 1
Part N.
5” Stub Pipe
Quantity - 4
Part O.
Hex Bolt
Quantity - 4
BOARDWALK HANDRAIL
LENGTH KEY
35.187”
Black
63.5”
Blue
51.5”
Green
50.5”
Yellow
5”
White