Operation, Calibration & Service Manual
LinkBelt - DS350 1334 Console
The correct setting is of utmost importance for the proper functioning of the system and the crane.
Therefore, only operators who are thoroughly familiar with the crane and the operation of the
system should execute the setting of the system according to the operating configuration of the
crane.
During the programming procedure the Load Moment Prewarning Light (3) and the Load Moment
Limit Light (2) will light up and the crane functions will be interrupted.
The LMI programming procedure consists of the following steps:
setting the boom type configuration
setting the counterweight configuration
setting lower configuration
specify boom / setting the hoist configuration and reevings
selecting the pick point
confirmation of the programming procedure
For easy operation, the computer guides the operator through the procedure step by step. (interactive
operation)
Definition of the Displayed Symbols:
The following illustrations define the symbols appearing on the display during the setup procedure for
your crane. Not all symbols will be shown, depending on the crane model and the answers to the
questions.
Setting the boom type configuration
main boom operation
tip extension operation
jib operation