STEP 4. ATTACHING GAS SOURCE
Screw on a preset air system into the airport located on the bottom of the grip
frame.
Be sure the air system is screwed in all the way into the Airport. If there is a leak
from the airport when screwing in the air system, replace the o-ring on the preset
regulator.
STEP 5. TURNING ON THE RAIL™ AND CHECKING THE VELOCITY
A. Make sure you and everybody around you is wearing ASTM / CE approved
paintball masks.
B. Press and hold the top button located behind the grip frame until the RAIL™
turns on.
WARNING, THE RAIL™ IS LIVE. MAKE SURE BARREL PLUG IS IN PLACE
AND DO NOT POINT THE RAIL™ AT ANYTHING YOU DON’T INTEND TO SHOOT.
C. Fill up the loader with .68 caliber paintballs.
D. Shoot the RAIL™ over a chronograph to check the velocity. If adjustment is
needed, adjust the velocity by turning the Hyper3™ velocity adjustment screw with
a 3/16” allen key. In (clockwise) will reduce the velocity and out (counter clockwise)
will increase the velocity. After each adjustment it takes a few shots before the
change can be seen on the chronograph. Never adjust the RAIL™ to shoot faster
than 300fps or what the field rules / local laws permit.
QUICK REFERENCE
USING YOUR MARKER
W
W
W
.
P
R
O
T
O
P
A
I
N
T
B
A
L
L
.
C
O
M
5