Protherm 20 KLO Скачать руководство пользователя страница 12

Supplied By www.heating spares.co  Tel. 0161 620 6677

 

 
 

Fig. 3b Vertical Control Panel 

 

  5 – Electric fuse 
  6 – Full/reduced power switch (only for 20, 30, 40, 50 KLO) 
  7 – SUMMER/WINTER switch 
  8 – RESET button 
  9 – Emergency thermostat 
10 – Heating operation regulator  
11 – Pump thermostat 

 

Boiler power output switch

 (only for 20, 30, 40, 50 KLO) ("two flames" / "one flame") serves for switching between the two 

degrees of power output – full or reduced. 

SUMMER/WINTER switch"

 

SUMMER

 

("sun" icon) – the boiler cooperates with external DHW reservoir; 

WINTER ("snowflake" icon) – the boiler provides heating water and cooperates with external DHW reservoir. 

Electric fuse

 – protects the boiler's electric installation from overload and short circuits. The fuse must not be repaired or replaced 

with "provisional solutions" (wires, etc.). If the fuse has been replaced and after switching the boiler on it was burnt again, a 
specialised service centre must be called! 

Emergency thermostat

 – protects the boiler from overheating 

 

The boiler must not be operated with the safety elements /flue gas and emergency temperature thermostats) disabled 
or replaced with elements different from those specified by the manufacturer! Users are not allowed to tamper with 
the safety elements.

 

Heating operation regulator 

("radiator" icon) – sets the heating water temperature 

l   

The set temperature of heating water must be higher than the value set on the pump thermostat – otherwise the pump will be 
permanently switched off. 

Pump thermostat

– it is a servicing element, set to 0°C in the manufacturing plant. The recommended value is 55°C – a different 

value can be set, depending on conditions on site (condensation at low-temperature mode, etc.) – the pump is activated only 
when the heating water in the boiler gets to the pre-set value. The settings can only be adjusted by a specialised service centre.  

5. Boiler Operation 

5.1. Boiler Preparation and Start 

The preparation for and commencing of the boiler operation are carried out by a specialised service centre. 

5.2. First Heating 

The First Heating is a short-term operation of the boiler in order to verify the correct installation and functions of the heating 
system and boiler. It is included in the commencing of boiler operation by specialised service centre. 

 

11

Содержание 20 KLO

Страница 1: ...By www heating spares co Tel 0161 620 6677 Instructions for Use and Installation of Cast Iron Boilers PROTHERM 20 30 40 50 60 KLO BEAR Version Protherm s r o ltd Pplk Plju ta 45 909 01 Skalica Slovak...

Страница 2: ...ig 3b Vertical Control Panel 11 Fig 4a Electric Wiring Diagram of PROTHERM 60 KLO 18 Fig 4b Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO 18 Fig 5a Regulation elements of SIT 843 combined gas ar...

Страница 3: ...Do not remove or damage any labels or markings on the boiler 9 The boiler complies with all Czech applicable regulations If it is to be used in another country deviations in the regulations have to b...

Страница 4: ...ted if the valve s motor is not active gets no voltage The boiler s manufacturer supplies both DHW reservoirs 100 150 200 l and suitable three way distribution valves l DHW heating takes preference ov...

Страница 5: ...onnection Dimensions 1 Control panel 2 HCW pressure measuring point 3 HCW temperature measuring point 4 Boiler cast iron body 5 Combined gas armature 6 Water filling and discharging 7 Burner plate dis...

Страница 6: ...the required and actual parameters i e the state of the boiler and the heating circuit the gas pipe leading out of the armature is part of the burner plate with 2 to 6 nozzles one per each burner tube...

Страница 7: ...3 Chimney flange 4 Flue gas duct with draft dampener 5 SKKT chimney draft control system 6 Outgoing HCW 7 Gas supply 8 Cast iron elements 9 Incoming HCW 10 Combustion chamber 11 Secondary air supply 1...

Страница 8: ...ce is solved by ventilation openings of sufficient size Gas appliances with flue gas removal to chimneys must not be in rooms in which negative air pressure is created by ventilation fans 3 4 Flue Gas...

Страница 9: ...pes so that the pipe fixtures on the boiler should not be affected by any pressures or tensions The fixtures on the boiler have outside male threads l Closing valves are recommended to be installed on...

Страница 10: ...gas piping i e electricity supply to the boiler must be stopped in addition to using the boiler switch e g by unplugging b Stopping the boiler whenever flammable or explosive vapours appear even if t...

Страница 11: ...such defects may be caused by not igniting the flame no gas or the chimney draft control system if there is none or too low a draft or emergency thermostat if the HCW temperature is above 100 C may h...

Страница 12: ...lements flue gas and emergency temperature thermostats disabled or replaced with elements different from those specified by the manufacturer Users are not allowed to tamper with the safety elements He...

Страница 13: ...regulator If the boiler does not ignite and the defect indicator is off the operation is stopped due to one of the operational reasons we have just described the heating will automatically start agai...

Страница 14: ...and persons under the influence of drugs or otherwise incapable must be prevented from operating the boiler 7 2 Quality Compliance The boiler s quality compliance is provided by and checked within the...

Страница 15: ...olted on a palette Do not let any forces act on the casing when handling or when storing the boiler For handling without a palette the base can be used cf Chapter 2 For storage normal conditions have...

Страница 16: ...eedle on the boiler pressure gauge 3 9 Electrical Connections of Boiler The electrical installation cabinet and the service part of the control panel are accessible when the top panel of the boiler is...

Страница 17: ...nufacturer These elements must also be checked after each servicing on them 5 Boiler Operation 5 1 Boiler Preparation and Start Check water pressure on the boiler pressure gauge Turn the gas supply va...

Страница 18: ...rocedure must be followed Only authorised service centres are allowed to carry out the conversion The following steps are to be followed 1 Dismount the burner from the boiler 2 Replace the nozzles wit...

Страница 19: ...ig 4b Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO HV Main switch PO1 Electrical fuse SP Power stage switch TL1 RESET button DT1 Emergency state indicator HT Emergency temperature thermostat TS...

Страница 20: ...1 620 6677 Fig 5a Regulation elements of SIT 843 combined gas armature for boilers 20 30 40 50 KLO a Input b Output 1 Setting screw for maximum 2 Setting screw for minimum Fig 5b Regulation elements o...

Страница 21: ...2 3 Flue gas removal manner to chimney to chimney diam outlet mm 130 130 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 13 3 19 8 Effi...

Страница 22: ...ue gas removal manner to chimney to chimney to chimney diam outlet mm 150 180 180 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 26 6 3...

Отзывы: