
5.13
•
pour oil to the gear oil up to the level of overflow coupler (A); if oil occurs in vent pipe,
mount the pipe in bracket,
•
pour oil to level (B) shown on the figure (
5.5A
),
•
screw oil tank plug (1) tight and screw vent plug (6) tight as well.
Oil volume in the gear is 16 litres. When changing oil, it is necessary to replace sealing
gasket under plugs.
TABLE 5.6
GEAR LUBRICANT SPECIFICATION
VISCOSITY RATING ACCORDING
TO AGMA
R&O EP
KINEMATIC VISCOSITY
IN TEMP. 40
0
C,
[mm
2
/s]
VISCOSITY RATING
ISO 3448
5
5 EP
198 – 242
VG 220
Before each start-up of the machine, one must check oil level in the system. If oil volume
is deficient, fill it up. Verify permeability of vent hole on the nut (1) of oil tank.
CAUTION
Temperature of gear casing may go over 80 C. If gear body becomes to warm, it is
necessary to contact with technical service.
5.8
ADJUSTING DRAUGHT BAR TO TRACTOR’S HOOK-TYPE
COUPLING
Before setting about accoupling feed car with tractor, it is essential to adjust draught bar to
hook-type coupling of tractor, so that the machine was levelled. There are two options of
setting draught bar, they were shown on figure
(5.6A)
. Adjusting position of draught bar ought
to be done my two individuals. In order to do so, one ought to:
•
position the feed car on flat ground, put wedges under whlles and immobilize the feed
car by pulling parking brake,
Содержание VMP-10
Страница 38: ...3 14 ...
Страница 52: ...4 14 ...
Страница 62: ...5 10 FIGURE 5 4A LUBRICATION POINTS OF THE FEED CAR 1 2 3 4 5 6 7 9 8 10 10 10 10 A B A B C C ...
Страница 75: ...5 23 THREAD STRENGTH RATING APPLIED FORCE Nm M8 8 8 20 M8 5 8 15 M6 5 8 5 ...
Страница 76: ...5 24 ...
Страница 77: ...NOTES ...
Страница 78: ... ...