![ProMinent DULCOTEST CTE 1-DMT Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/prominent/dulcotest-cte-1-dmt/dulcotest-cte-1-dmt_operating-instructions-manual_1616854031.webp)
31
Pr
o
Minent
®
Measurement
station
In a complete measuring station the DULCOTEST
®
CTE 1 sensor is electrically
connected to the DULCOMETER
®
D1C, chlorine controller via a standard
two-wire signal lead. The controller is connected to the power supply.
The sensor is mounted either in the DLGIII or in the modular DGM in line
probe housing. A sampling tap (see Ordering information, Chapter 15) for the
external DPD-measurement (see Calibration, Chapter 8.2) can be screwed
into the base plate of the DGM.
The in-line probe housing is hydraulically connected to the sample water flow.
Design and function
Cl
R?
DULCOMETER
R?
DULCOTEST
DULCOTEST
R?
R?
80
60
40
25
l/h
STOP
Fig. 2
Measurement
station
DULCOMETER
®
D1C, chlorine
Sampling tap
Two-wire signal
lead
Sample water
outlet
DULCOTEST
®
CTE 1
DGMa in line
probe housing
Sample water
inlet
BA_DT_106_12_09_4spr.p65
15.12.2009, 10:26 Uhr
31