
Check that the brine flow corresponds to the setpoint.
26. The booster pump should start up at the start of production
as soon as the liquid level in the separating tank has reached
the right level.
27. Check whether the value of the water flow of the process
water at the flow meter corresponds to the value on the
screen.
28. Check that all customer-specific components are operating
correctly. The customer-specific components in question are
listed on page 1 of the test log.
29. Check that the fans for the control cabinet are working cor‐
rectly.
Make sure that the fans are rotating in the right direction. The
fans on one side must prime air into the control cabinet and
the fans on the opposite side must discharge air to the out‐
side.
30. On the PLC display, press
[Start-up] and check whether the
caustic tank fills up with process water.
Checking that the booster pump is
starting up
Customer-specific components
Filling the caustic tank with the button
on the PLC
Commissioning
48