7
Commissioning
n
User qualification, preparation for commissioning/commis‐
sioning: trained qualified personnel
INFORMATION!: The DULCO
®
Lyse systems must be started up in
the following order under the appropriate conditions. The system
can only be safely started up, guarantee seamless operation and
the warranty granted if this order is adhered to.
7.1 Check-list: Preparation for commissioning
Customer
Project number
Capacity
g/h
Tested by:
Pre-commissioning
Commissioning
Tab. 2: Basic production settings for testing and commissioning.
Capacity
Cell type
Current
Max. voltage
Brine volume
Anode refresh
Lye
33 %
(g/h)
(A)
(V)
ml *
(l)
100
HMC 10-1
100
6
400
3.5
200
HMC 10-2
100
12
400
3.5
300
HMC 10-3
100
18
500
3.5
* The parameters are based on an ambient temperature of 20 °C and a brine concentration of 280 g/l. The
refresh time is calculated by the PLC. It will affect the product concentration if these parameters change.
Commissioning process for the
DULCO
®
Lyse
Commissioning
37