
7.3 Commissioning work
n
User qualification, commissioning: Service
Prior to the start of commissioning, check that all preparations
have been completed correctly. Commissioning is divided into two
phases. Commissioning preparation is used to monitor the installa‐
tion phase and should be performed prior to commissioning.
Only allow trained service technicians to commission the system.
Check that the system has been installed correctly and that work
has been performed in line with the check-lists.
Ventilate the room.
Fire, naked flames and smoking are prohibited
Wear safety glasses.
Wear safety gloves.
Caution high voltage.
Danger due to corrosive dust.
The customer is responsible for the consequences of the failure to
use protective equipment and disregard for the warnings in this
document.
The use of personal protective equipment (PPE) is specified in the
regulations applicable at the installation place. The consequences
of disregarding these regulations are likewise explained in these
local regulations.
Commissioning
42