background image

© 2014 Proceq SA 

11

On completion of the test the summary screen shows the peak load, 
test duration and the effective load rate. The motor winds back auto-
matically ready to begin the next test.

       

Press the center key to enter “Failure Mode Recording”. (See below.)
Press on save to complete the test and return to the main menu.
If you do not wish to save the test, select the delete icon and press the 
center key to return to the main menu.

Note: If you do not wish to record the failure mode, simply press on save to complete the 
test. The test will be saved and you will return to the main menu.

5.2.1  Peak load, test duration and effective load rate

The peak load is the maximum load achieved during the test.
The test duration begins when the load reaches 250 N (56 lbf) (load rate control begins) and ends at 
the time when the end of test criteria is reached. If this is set to 0 % this can be misleading. Look at 
the graphical output in this case for confirmation.
The effective load rate is calculated from the point at which load rate control begins (250N) to the 
time at which 80 % of the peak load is reached. (This is done to avoid inconsistencies in load rates 
caused by non-clean breaks when elastic and thermoplastic materials are being tested.)

5.2.2  Load rate warning

Pull-off testing from a single side, is best suited for rigid substrates. Deformable substrates or elas-
tic coatings can lead to a falsification of the results of a pull-off test. Proceq DY-2 provides the tools 
to help in the analysis when testing on such materials.
If the load graph appears on the measurement screen as a blinking icon during a test, it indicates 
that the programmed load rate cannot be achieved.

The most likely cause of this is due to plastic deformation of either the substrate or the material 
under test or the selection of a load rate beyond the capabilities of the instrument (see technical 
specifications).
It is recommended in this case to store the test result and download it to DY-Link for detailed 
analysis.

Содержание DY-2 series

Страница 1: ...Proceq DY 2 Operating Instructions Swiss Precision since 1954...

Страница 2: ......

Страница 3: ...oceq DY 2 Menu 6 4 Test Parameter Settings 6 5 Performing a Pull Off Test with Proceq DY 2 9 5 1 Test Preparation 9 5 2 Measurement Procedure 10 5 2 1 Peak load test duration and effective load rate 1...

Страница 4: ...e check operation and maintenance of the instrument and its components Unauthorized structural modifications to the instrument and its components Serious damage resulting from the effects of foreign b...

Страница 5: ...th by near to surface tests 50mm 0 05 0 03 MPa s ASTM D 4541 Standard test method for pull off strength of coatings using portable adhesion testers 1 MPa s 100s ASTM C 1583 Standard test method for te...

Страница 6: ...ded for elastic surfaces due to higher requirement on load rate Proceq DY 216 covering most applications Recommended for elastic surfaces due to higher requirement on load rate Proceq DY 225 required...

Страница 7: ...nt A complete charging cycle will take approximately 3 hours longer in the case of a deep discharge Note When charging the battery or when operating on mains supply the charging circuit will be discon...

Страница 8: ...ts down automatically after 5 minutes of inactivity 3 3 The Proceq DY 2 Menu On start up the main menu screen will be shown Set Measurement Unit Start Test Memory Select Test Disc Diameter Set Test Di...

Страница 9: ...m value If no maximum load is required this should be set at the maximum value supported by the instrument i e 6kN 16kN or 25kN Press the center key to complete the action Load rate Set the load rate...

Страница 10: ...00 measurements When completely full the oldest will be overwritten To review the saved measurements follow the procedure below Choose the memory icon Choose the icon to review the measurements Scroll...

Страница 11: ...s are The size of the test disc The load rate applied to the test disc The total time allowed for the test 5 1 Test Preparation Pull off testing is used on many different types of materials The actual...

Страница 12: ...If the surface is inclined this method is not practical 5 2 Measurement Procedure Press the center key to begin Verify settings Note In the case of square discs the diameter is a theoretical value Pa...

Страница 13: ...at the graphical output in this case for confirmation The effective load rate is calculated from the point at which load rate control begins 250N to the time at which 80 of the peak load is reached T...

Страница 14: ...cture as a percentage to the nearest 10 for each type of fracture The first column indicates where the break took place The second column indicates the percentage of the break in that particular layer...

Страница 15: ...load must not exceed 16kN See Chapter 4 Set the Load Parameters 6 2 Working on vertical surfaces or overhead When working on vertical surfaces or overhead ensure that the test disc is firmly glued to...

Страница 16: ...ions calibration certificate and carrying case 7 2 Test Discs and Accessories 346 10 500S Test disc steel 50mm M10 set of 10 346 10 501S Test disc aluminum 50mm M10 set of 10 346 10 502S Test disc alu...

Страница 17: ...have the instrument serviced and re calibrated on a yearly basis Customers may however determine their own service interval based on application and usage The instrument assists with determining a su...

Страница 18: ...stored on Proceq DY 2 Double click on the DY Link icon on your desktop or start DY Link via the start menu DY Link starts with a blank list Application settings The menu item File Application setting...

Страница 19: ...ty programs Click on the measurement object s you wish to export Click on the Export measurements to CSV file s icon The data for this measurement object s is exported as a Microsoft Office Excel comm...

Страница 20: ...op of the screen PQUpgrade icon Allows you to upgrade your firmware via the internet or from local files Open DY link project file icon Allows you to open a previously saved pqr project Save project i...

Страница 21: ...window Start the test on the Proceq DY 2 and the load increase will be displayed in real time until the test is completed Note This curve is for monitoring purposes only You have to perform a download...

Страница 22: ...2014 Proceq SA 20 Notes...

Страница 23: ...2014 Proceq SA 21 Notes...

Страница 24: ...4 korp 2 lit A Office 410 197374 St Petersburg Russia Phone Fax 7 812 448 35 00 info russia proceq com Proceq Middle East P O Box 8365 SAIF Zone Sharjah United Arab Emirates Phone 971 6 557 8505 Fax 9...

Отзывы: