
55
Figure 26. Place insert over drive shaft
5.
Install the bearing housing over the insert, ensuring one of the grease nipples is aligned with the upper surface
of the mix auger.
Figure 27. Installing bearing with grease nipple facing upwards
6.
Install the carriage bolts with the head inside the mix auger frame and the nuts at the bearing side loose so the
bearing is free to move along the face of the offset bracket.
7.
Install the bearing collar by hand then using a collar wrench or punch and mallet tighten the collar until
resistance is felt then turn the collar another ¼ turn.
Содержание P Series
Страница 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Страница 2: ...2 5810 47 Avenue Olds Alberta Canada T4H 1V1 E info proallinc com P 403 335 9500 F 403 335 9560 ...
Страница 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Страница 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Страница 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Страница 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Страница 105: ... BATTERY V BATTERY V ...