
29
5.4.8
BOOM/CHUTE/SWING
All
functions:
If
the
boom,
chute
or
swing
seem
slow
or
is
not
moving
check
the
speed
settings
on
the
Mixer
Settings
and
Maintenance
screen
.
All
three
functions
have
indicator
lights
on
the
coils.
Current
draw
readings
are
accessible
in
the
Electrical
Diagnostics
screen.
These
three
functions
run
off
the
auger
hydraulic
circuit,
so
pressure
can
be
monitored
by
reading
the
auger
pump
pressure.
In
the
event
of
an
electrical
failure
all
three
functions
can
be
manually
overridden
to
stow
the
mix
auger
and
make
the
truck
ready
for
transport.
See
valve
manual
overrides
section.
Boom:
If
the
boom
creeps
down
on
its
own
when
loaded
the
boom
counterbalance
valve
needs
to
be
adjusted.
Loosen
the
locknut
with
a
9/16”
socket
and
turn
the
screw
CCW
using
a
4mm
Allen
key
to
increase
the
pressure
setting
until
the
boom
stops
creeping.
Tighten
the
lock
nut.
Chute
Tilt:
If
the
chute
creeps
down
on
its
own
when
loaded
the
chute
counterbalance
valve
needs
to
be
adjusted.
Loosen
the
locknut
with
a
19mm
wrench
and
turn
the
screw
CW
using
an
8mm
Allen
key
to
increase
the
pressure
setting
until
the
chute
stops
creeping.
Tighten
the
lock
nut.
Chute
Extend/Retract:
(Special
Version,
may
not
apply)
The
chute
extension
circuit
is
shared
with
the
boom
and
only
one
can
be
activated
at
a
time.
The
diverter
valve
is
energized
when
the
chute
extension
function
is
on.
A
cross
port
relief
valve
protects
the
chute
extension
system
from
excessive
loads
by
limiting
the
pressure
below
that
of
the
auger
pump
max
pressure.
This
valve
is
pre
‐
set
both
sides
to
2500psi,
but
it
is
adjustable
up
to
3300psi.
The
extension
chutes
are
sequenced
in
and
out
by
an
adjustable
sequence
valve
circuit.
Only
one
chute
can
move
at
a
time.
Sequence
valve
adjusts
the
out
‐
sequence
pressure
and
is
pre
‐
set
to
1500psi.
Sequence
valve
adjusts
the
in
‐
sequence
pressure
and
is
pre
‐
set
to
2000psi.
D
B
B
A
C
D
A
C
E
E
F
G
Содержание P Series
Страница 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Страница 2: ...2 5810 47 Avenue Olds Alberta Canada T4H 1V1 E info proallinc com P 403 335 9500 F 403 335 9560 ...
Страница 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Страница 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Страница 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Страница 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Страница 105: ... BATTERY V BATTERY V ...