
49
Figure 14. Place anti-seize on idler shaft
Note: To make installation easier, support the auger screw with a crane or other lifting device for the following steps.
11.
Align the bolt holes in the mix auger tube with the holes in the idler shaft and slide the mix auger onto the idler
shaft.
12.
Using a rod or drift, align the holes in the auger with the idler shaft and install a shaft bolt (PN 1261817 &
233111) into the hole farthest from the bottom bearing. This bolt is close in size to the hole and may need to be
tapped in with a hammer.
Figure 15. Use rod or drift to align holes in shaft and auger
Содержание P Series
Страница 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Страница 2: ...2 5810 47 Avenue Olds Alberta Canada T4H 1V1 E info proallinc com P 403 335 9500 F 403 335 9560 ...
Страница 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Страница 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Страница 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Страница 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Страница 105: ... BATTERY V BATTERY V ...