
51
Figure 18. Place silicone on both sides of auger seal
2.
Lightly grease the oil seal (PN 327200) within the bearing seal assembly (PN REJ432) to aid in seal installation.
3.
With a seal pick or equivalent, place the bearing seal assembly over the shaft ensuring the grease hose hole in
the outer edge of the bearing seal assembly is oriented towards the upper right-hand side of the mix auger. Slide
the assembly over the shaft, contacting the auger seal.
Figure 19. Install bearing seal assembly
4.
Install the auger seal (AGSL005A) over the shaft.
5.
Loosen the collar of the bearing (PN AGBR006) and orient the grease fitting hole to the right-hand side of the
mix auger frame.
Содержание P Series
Страница 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Страница 2: ...2 5810 47 Avenue Olds Alberta Canada T4H 1V1 E info proallinc com P 403 335 9500 F 403 335 9560 ...
Страница 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Страница 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Страница 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Страница 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Страница 105: ... BATTERY V BATTERY V ...