background image

operaTIon

EmpyrE ElItE Xt InstallatIOn and OpEratIOn manual 

19

Take the following precautions to protect the fire brick and 

maintain optimal performance.
1.  Do not carelessly throw heavy pieces of wood onto the 

brick.

2.  Gently rake ashes out of secondary burn chamber.

3.  Do not damage brick while stirring the fire.

4.  Do not attempt to cool down hot bricks quickly.
5.  Do not run furnace with pieces of brick missing.
6.  Do not alter the brick and insulation layout. This layout 

has been carefully engineered to achieve the best 

performance.

Blower draft setting

The blower and flapper unit flap opening settings are pre-

determined by the factory and must NOT be altered. Altering 

these components could cause damage to the furnace and 

void the warranty. To replace any of these components you 

must contact your Empyre Elite XT dealer.

nOtE: 

This is not a natural draft furnace. It is a forced air 

furnace where the blower controls the fire.

doors

The Empyre Elite XT doors have an adjustable hinge and 

latch. Adjust doors to maintain a tight gasket seal. Keep 

doors closed and maintain all door seals in good condition.

Exhaust Exit lever Operation

When the exhaust exit lever above the loading door is in the 

right hand position, the furnace is in its normal operating 

mode. When the lever is moved to the left, the furnace is 

now in the loading mode. In the loading mode the exhaust 

exit is open at the rear top of the firebox and air is directed in 

front of the baffle. The blower will only run for a timed period 

and then shut off. To reactivate the timer, the lever must 

be moved to the full right position and then back to the left 

position, or switch furnace off and back to on. 

loading procedures: 

1.  Move lever to the left hand side and wait momentarily. 

Slowly open the loading door.

2.  Rake the ash and load the firebox. Note: if blower shuts 

down before loading is complete, reactivate by moving 

the lever fully to the right and then back to the left. 

3.  Close door securely and move lever fully to the right. 

Note: if the lever is not fully to the right the furnace 

WILL NOT operate.

to maintain optimal performance:

1.  Do not leave loading door open for extended periods of 

time, especially when the fire is very hot.

2.  Do not force the loading door open beyond the stop.

power Outages

The  Empyre  Elite  XT  furnace,  unlike  a  gas  or  oil  fired 

appliance, does not stop generating heat when the power 

is interrupted even though the blower automatically shuts 

off causing the fire to die down. As a result the heat transfer 

fluid in the furnace may overheat and boil off through the 

vent. When power resumes be sure to check the fluid level.

Operation do’s and don’ts

1. When loading wood keep the loading door open for the 

least amount of time as possible.
2. After loading wood, when wood is burning hot DO NOT 

open the loading and ash doors for several hours. This 

will avoid hot discharge from the doors and keep chimney 

temperatures at a proper operating level.
3. When wood is burning hot DO NOT unneccesarily shut 

off the furnace and then turn it back on. Wait at least 10 

minutes before turning it back on. This will avoid back 

pressure coughing through the chimney when the furnace 

comes back on.
4. DO NOT open ash door when the wood is burning hot or 

just after the furnace shuts off. If not sure, open loading 

door  first  before  ash  door.  This  will  avoid  hot  discharge 

from the open door.

5. DO NOT fill the firebox with very dry wood. Extremely dry 

wood will burn excessively fast which will cause smoke,  

back pressure and coughing through the chimney.
6. Reloading when the wood is burnt down to only ashes 

(the  same  applies  for  starting  a  new  fire):  start  fire  with 

paper and small pieces of wood, then continue adding 

bigger pieces. After 10 minutes, reposition the wood. 

In some instances you may need to reposition the wood 

several times. Important: DO NOT have door open or lever 

to the left more than necessary. If there is only smoke and 

the  air  from  the  open  door  ignites  the  fire,  the  slots  are 

plugged and the wood needs to be repositioned to ensure 

air is flowing into the secondary burn chamber.

When the brick has cooled, it will take extra effort to get a 

good fire going as the wood will bridge more.

7. Always keep some hot wood coals on the brick. As 

needed, level off the bed of coals with the rake before 

reloading.

Содержание Empyre Elite XT

Страница 1: ...Installation and Operation Instructions Empyre Elite XT Model 100 and 200...

Страница 2: ......

Страница 3: ...tion Dimensions 11 Trench for Underground Pipes 11 Outdoor Furnace Installation 12 Outdoor Chimney Installation 12 Indoor Chimney Installation 12 Supplying Make Up Air 12 Low Water Temperature Protect...

Страница 4: ...During Heating Season 20 End of Heating Season 21 Reference 22 27 Operating the Digital Temperature Switch DTS 22 Hot Water Wood Furnace Wiring Diagram 23 How to Correct a Sticking Flapper 24 Furnace...

Страница 5: ...e Empyre Elite XT Works The Empyre Elite XT uses a process called wood gasification to produce highly efficient combustion in the furnace s dual burn chambers 1 Wood in the firebox burns from the bott...

Страница 6: ..._________ Serial No _______________________________ EMPYRE ELITE XT HYDRONIC FURNACE 15 Empyre Elite XT 100 200 702112231 or 70626288 Empyre Elite XT 100 200 no 702112231 ou no 70626288 817978R00 Mode...

Страница 7: ...running mode timer is then locked out 2 After loading CLOSE and LATCH door firmly and move LEVER to the right DO NOT operate with loading door open ASH REMOVAL DOOR ALWAYS OPEN SLOWLY 1 ALWAYS switch...

Страница 8: ...ally hazardous situation that if not avoided MAY result in minor or moderate injury if proper practices are not taken or serves as a reminder to follow appropriate safety practices Safety Decals Pleas...

Страница 9: ...PA 211 and NFPA90B Chimney must be a listed UL 103 HT or ULC S629 residential all fuel type or tile lined masonry Flue connector pipe must be made of a minimum 24 NSG black steel Special precautions a...

Страница 10: ...or Panel 13 Secondary Burn Chamber 13 A Brick Configuration No Description 13 B Insulation Board Configuration 14 Ash Tray 15 Smoke Deflector Angle 16 Latch Catch Locking Bolt Front Rear Door 17 Latch...

Страница 11: ...39 Electric Element Ports 40 Flue Cleaning Tool 41 Drain 42 Rear Lower Cover No Description 43 Right Side Panel 44 Supply Port 1 Elite XT 100 1 1 4 Elite XT 200 45 Flue Clean Out Cover 46 Probe Shiel...

Страница 12: ...rovided that a noncombustible liner such as sheet metal or masonry be placed on the floor ensuring the following areas are covered to catch stray embers Underneath the furnace At least 16 406 mm in fr...

Страница 13: ...to determine the line size necessary to meet the demands of your specific application 4 Identify each water line clearly in order to correctly locate the supply and return lines 5 Lay down 14 2 under...

Страница 14: ...Sections of stove pipe minimum 24 gauge black or blued steel may be used from the furnace to the insulated chimney Note avoid using 90 Elbows 45 is recommended A chimney cap must be installed Lining m...

Страница 15: ...ESO and Valve Operates The Empyre System Optimizer provides a constant circulation of water through the boiler and the Danfoss VTC tempering valve Water is drawn off the low loss header by the buildin...

Страница 16: ...Closely Spaced Tees See Note Empyre Elite XT Figure 2 Connect to Existing Boiler Pump Boiler Return Plate Exchanger Pump Boiler Supply Existing Boiler Return from System Pump ESO Figure 3 Empyre Elit...

Страница 17: ...arm as low as possible Side Arm Installation Figure 1 To domestic heating system Hot water in from Pro Series furnace To top of hot water tank From bottom of hot water tank Figure 2 PUMP BALL VALVE TH...

Страница 18: ...through vent opening Figure 1 9 Check water level when water temperature is 170 F 77 C and add water until level indicator shows full Maintaining Proper Water Level When the water level is low the Em...

Страница 19: ...wood when possible When using the recommended seasoned wood where the moisture content is between 19 and 25 the diameter of the wood is not that important Scenario 1 is also created when stirring a h...

Страница 20: ...out ash tray 4 Reach the ash rake to the back of the chamber and pull ash forward into the ash tray Do not scrape all of the ash into the ash tray It is recommended to leave 1 2 2 5 5 1 cm of ash cov...

Страница 21: ...nace WILL NOT operate To maintain optimal performance 1 Do not leave loading door open for extended periods of time especially when the fire is very hot 2 Do not force the loading door open beyond the...

Страница 22: ...er flues weekly A buildup in the flues and chimney will cause a poor draft and reduce efficiency 6 Check and clean the air passages in the upper loading door frame several times during the heating sea...

Страница 23: ...treatment is in the system In the event that there has been water loss through the season additional water treatment will need to be added Follow the treatment ratio on the bottle for additional gallo...

Страница 24: ...ircuit probe error Open probe error DTS Technical Data Accuracy 1 Output 16 Amp 1HP 240 Vac SPDT relay Supply voltage 115 Vac 10 Display 3 digit red DTS Programming Press SET SP text will appear on th...

Страница 25: ...range 1 White Orange Yellow Blue Blue Blue Yellow Purple White Red Orange Ground 110 volts AC 60Hz Black power line White neutral line NO NC 2 CAUTION DO NOT CONNECT THE ELECTRICAL COMPONENTS OF THIS...

Страница 26: ...ist 1 Check if furnace is being operated properly 2 Remove flapper unit check to ensure the flap seals in the closed position clean and oil How to Remove and Reinstall 1 Disconnect power 2 Remove blow...

Страница 27: ...15 cm 6 in 15 cm Log Length 24 in 61 cm 25 in 64 cm Log Diameter 6 in 15 cm 6 in 15 cm Furnace Weight excluding pallet 1 050 lb 476 kg 1 635 lb 742 kg Water Capacity 60 US Gal 227 L 112 US Gal 424 L N...

Страница 28: ...569 9 61 81 335 2 13 20 852 5 33 56 1484 5 58 45 Elite 100 Unit Dimensions 3 1 4 1 2 Not shown 0 817753 Revisions DESCRIPTION ECO Production Release 2535 REV Figure 2 Brick Layout Figure 3 Refractory...

Страница 29: ...Front Burn Chamber Elite 200 1 3 1 2 4 Elite 200 Refractory Layout ITEM NO PART NO DESCRIPTION QTY 1 816951 Insulation Fibre Board Side Burn Chamber Elite 200 6 2 816952 Insulation Fibre Board Bottom...

Страница 30: ...s air passage in the firebox floor is blocked by charcoal ash Using the ash rake always stir the firebox charcoal ash into the lower ash chamber before adding wood Limit the charcoal ash buildup and l...

Страница 31: ......

Страница 32: ...Registration and a copy of the original bill invoice must be forwarded to Pro Fab within thirty 30 days of the date of purchase to validate the warranty Issue Date February 2013 Part No 817969R01 Prin...

Отзывы: