26
Date:
20-11-2014
Data name:
esc300-2-v12a_EN
ESC300 (swv-1.06)
Author:
Heiko Lange
Pages:
72
© P. Prinzing GmbH - 89173 Lonsee-Urspring (Germany)
Service: +49 (0) 7336 - 961018
* Option / depends on design
Commissioning
Commissioning of one alley (alley 1...6):
1. Press in the operation mode the button
ESC
on the remote
The main menu opens
2. Chose in the main menu an alley, e.g. „alley 1“ (alley 1...6)
The menu „alley 1“ opens
Do the single settings, as described in the following chapters (5.4.1 ff).
INFO
When you exchange, expand or change single compo-
nents on the dung removal system (e.g. motors, alley
length, or similar) you have to do the commissioning
for the respective alley again.
When the commissioning is completely done, the
control ESC300 with its programs P1 + P2 is operable
(see chapter operation).
ATTENTION
Changes on the set parameters or incomplete or
wrong settings on the parameters may lead to mal-
functions of the control!
5.4.1 Chose motor type (nominal capacity)
Set the motor type (nominal capacity in kW) of the drive winches:
1. Chose in the main menu an alley (1...6)
Use the arrow buttons up/down for the selection
2. Chose in the menu alley (1...6) the item „setup“
Use the arrow buttons up/down for the selection
3. Press
ENTER
( ) to open the „setup”
4. Use the arrow buttons, to chose a motor
Use the arrow buttons up/down for the selection
5. Press ( ) to edit the motor selection
6. Press the
ARROW BUTTONS
( / ) to chose the motor capacity
7. Press
ENTER
( ) to save the changes
8. Do the settings for both motors
When using a double winch adjust both motors in the same way!
9. Press
ESC
to leave the menu
Press ESC so oft, till the operation mode will be displayed, or navigate to another
menu item.
26/1
Menu item “Setup”
26/2
Menu item “Setup” - set the motor
nominal capacity
Motor-nominal capacity
The motor nominal capacity you
can fi nd on the name plate of
the respective motor on the drive
winch.