Printed in USA 12/20 © 2020
20
527-504rev
M
_EN
Vertical Toaster
DCFT-MCD Series
Remove/Replace Crown Compression Adjust Assy (cont.)
Feed camshaft through square opening in frame.
2
0
Use leverage to secure left and right sides of conveyor
into frame.
On both left and right side of conveyor belt, secure
vice grip to bracket and top nut to hold assembly in
position.
2
2
Bracket
Nut
Install Sprocket shaft and feed through intermediate
support bearing.
25
Attach (2) E-Clips to sprocket shaft both front and
2
4
back.
Install 6 screws with stubby Phillips screw driver.
2
5
Screws
(3 on each
side)
Reference Club Transfer gear belt install. Page 29.
2
6
Route crown heater wire through hole in frame.
2
7
2
1
2
3
Содержание DCFT-MCD Series
Страница 5: ...527 504revM_EN 5 Printed in USA 12 20 2020 Vertical Toaster DCFT MCD Series Display Menu Options...
Страница 44: ...Printed in USA 12 20 2020 44 527 504revM_EN Vertical Toaster DCFT MCD Series Exploded View and Parts List...
Страница 45: ...527 504revM_EN 45 Printed in USA 12 20 2020 Vertical Toaster DCFT MCD Series Exploded View and Parts List...
Страница 46: ...Printed in USA 12 20 2020 46 527 504revM_EN Vertical Toaster DCFT MCD Series Exploded View and Parts List...
Страница 47: ...527 504revM_EN 47 Printed in USA 12 20 2020 Vertical Toaster DCFT MCD Series Exploded View and Parts List...
Страница 50: ...Printed in USA 12 20 2020 50 527 504revM_EN Vertical Toaster DCFT MCD Series Wiring Diagram...