STEP 5:
Thread cable through static pressure port on face of BTR filter
NOTE:
It is recommended to rest the filter frame on 2x4 lumber to protect the LED light from breaking
STEP 6:
Put lock washer and threaded standoff back on cable and tighten to LED.
FAN FILTER UNIT - HIGH EFFICIENCY
INSTALLATION & SERVICE INSTRUCTIONS
Installed LED on Filter Face
Filter Resting on Lumber
Threaded Standoff through Filter Channel
29
priceindustries.com | FAN FILTER UNIT - HIGH EFFICIENCY - Manual