8
Step #24
Install tray(s) onto mounting studs
and secure with nuts. Do not over
tighten nuts.
Step #22
Determine feeder and local pigtail
length based upon adapter plate
location. See charts below.
Plate
Location
Feeder
Pigtail Length
Local
Pigtail Length
A
56" (142 cm)
44" (112 cm)
B
56" (142 cm)
44" (112 cm)
Plate
Location
Yellow Braid
Length Feeder
Pigtails
Yellow Braid
Length Local
Pigtails
A
18-3/4" (48 cm)
9 -1/2" (24 cm)
B
18-3/4" (48 cm)
9-1/2" (24 cm)
Step #21a
Step #20
Select feeder fiber to be spliced.
Route and store buffer tubes in
storage brackets.
X
Cut fiber to be spliced here
Cut fiber
Secure adapter plate assembly to
mainframe with fasteners provided.
Step #21b Measure and mark buffer tube 43"
from cable sheath opening. Remove
buffer tube beyond this mark to
expose fiber to be spliced.
43" (109 cm)
Step #23 Route incoming fibers and outgoing
pigtails, and splice per standard
company practices.
INCOMING FIBER OUTGOING PIGTAILS
Critical Step:
Position assembly according to image in
Step 21a to insure selected fiber is cut at
the proper location.
Step #19
Bottom view of organizer.