16
17
Step 2:
Open completely the gate and place the other magnet holder on the rack,
facing the automated REED. This magnet will act as an end of course of opening.
Step 3:
Start the engine and see if the REED’s are shutting off properly.
If necessary, invert the connector on the board.
After attaching the magnet holders, make final adjustments by moving them to
the right or left, depending on the setting you want.
Step 4:
To finalize the installation of the automation, it is mandatory before turning
it on, screwing the fairing with 2 x 3.5 x 16 mm screws (available in the kit).
gate opening
support of
the magnet
support of
the magnet
support of
the reed
upper View
brackets adjustments