Step 2:

 Open completely the gate and place the other magnet holder on the rack, 

facing the automated REED. This magnet will act as an end of course of opening.

Step 3:

 Start the engine and see if the REED’s are shutting off properly.

If necessary, invert the connector on the board.

After attaching the magnet holders, make final adjustments by moving them to 

the right or left, depending on the setting you want.

Step 4:

 To finalize the installation of the automation, it is mandatory before turning 

it on, screwing the fairing with 2 x 3.5 x 16 mm screws (available in the kit).

gate opening

support of
the magnet

support of
the magnet

support of

the reed

upper View

brackets adjustments

Содержание DZ RIO 350 JET FLEX

Страница 1: ...S LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 0800 550 250 ATTENTION Do not operate the equip ment without first reading the instruction m...

Страница 2: ...y is compatible with that required on the equipment identification labe Do not connect the mains until installation maintenance is complete Always make electrical connections to the control unit with...

Страница 3: ...130 C Class B 130 C TRAVEL STOP Analogic Digital Analogic Digital Hybrid Maximum gate leaf mass 400 Kg 400 Kg 400 Kg MAXIMUN GATE DIMENSION HEIGHT 2 5 m LENGTH 3 0 m HEIGHT 2 5 m LENGTH 3 0 m HEIGHT...

Страница 4: ...REQUENCY 60 Hz 60 Hz 60 Hz NOMINAL POWER 450 W 395 W 140 W 170 W ENGINE RPM 1740 RPM 1740 RPM 4365 rpm NOMINAL CURRENT 2 1 A 3 1 A 1 1 A 1 7 A REDUCTION 1 23 1 23 1 23 LINEAR VELOCITY 17 1 m min Z18 1...

Страница 5: ...d closing properly Open the gate manually and observe the effort required This effort should be minimal for the entire length of the course Step 2 Close the gate manually and check whether the exertio...

Страница 6: ...on of this equipment depends on the instructions in this manual To fix the equipment proceed as follows Step 1 Make sure that the floor is firm enough so that the equipment can be screwed so that it i...

Страница 7: ...ll back the automation Step 6 With the automator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the...

Страница 8: ...ly attach the automation to the floor or concrete base tightening the bolts ANALOG END OF COURSE INSTALLATION Step 1 With the gate closed place the magnet holder in the rack positioned in front of the...

Страница 9: ...cessary invert the connector on the board After attaching the magnet holders make final adjustments by moving them to the right or left depending on the setting you want Step 4 To finalize the install...

Страница 10: ...Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the end of course sys...

Отзывы: