CAUTIONS WITH THE ELECTRICAL GRID

To avoid damage to the wiring, it is important that all conductors are properly 

attached to the automation. Wiring must be done through conduits, passing 

internally through the base of the fl oor, ensuring that none of the wiring conductors 

are trapped and damaged.

It is mandatory that the 

ground terminal is connected 

to the ground cable.

IMPORTANT

The device must be powered by a residual current (DR) device with 

a rated residual current exceeding 30 mA.

CARE WITH THE GATE BEFORE AUTOMATION

Before adapting the machine to the gate, check the sliding by following the 

instructions below:

Step 1:

 Before Installing the automation, check if the gate is in good mechanical 

condition, ie opening and closing properly. Open the gate manually and observe 

the eff ort required. This eff ort should be minimal for the entire length of the course.

Step 2:

 Close the gate manually and check whether the exertion exerted was the 

same as the previous operation.

The gate shall have a sturdy and, as far as possible, non-deformable structure. The 

pulleys shall be of diameter conforming to the dimensions of the gate, in perfect 

running condition and mounted in such a way that the gate leaf has stability 

throughout its displacement. We recommend sheaves with a diameter of at least 

120 mm.

The fi gures below represent the two types of rails and pulleys used. The system 

that uses straight section (Figure A - angle bracket) presents greater friction 

and consequently greater wear. The circular section (Figure B) allows a better 

displacement of the gate and less friction for the automation.

mEANS OF 

ShuTDOWN

CONDuIT

FIGURE A

FIGURE B

Содержание DZ RIO 350 JET FLEX

Страница 1: ...S LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 0800 550 250 ATTENTION Do not operate the equip ment without first reading the instruction m...

Страница 2: ...y is compatible with that required on the equipment identification labe Do not connect the mains until installation maintenance is complete Always make electrical connections to the control unit with...

Страница 3: ...130 C Class B 130 C TRAVEL STOP Analogic Digital Analogic Digital Hybrid Maximum gate leaf mass 400 Kg 400 Kg 400 Kg MAXIMUN GATE DIMENSION HEIGHT 2 5 m LENGTH 3 0 m HEIGHT 2 5 m LENGTH 3 0 m HEIGHT...

Страница 4: ...REQUENCY 60 Hz 60 Hz 60 Hz NOMINAL POWER 450 W 395 W 140 W 170 W ENGINE RPM 1740 RPM 1740 RPM 4365 rpm NOMINAL CURRENT 2 1 A 3 1 A 1 1 A 1 7 A REDUCTION 1 23 1 23 1 23 LINEAR VELOCITY 17 1 m min Z18 1...

Страница 5: ...d closing properly Open the gate manually and observe the effort required This effort should be minimal for the entire length of the course Step 2 Close the gate manually and check whether the exertio...

Страница 6: ...on of this equipment depends on the instructions in this manual To fix the equipment proceed as follows Step 1 Make sure that the floor is firm enough so that the equipment can be screwed so that it i...

Страница 7: ...ll back the automation Step 6 With the automator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the...

Страница 8: ...ly attach the automation to the floor or concrete base tightening the bolts ANALOG END OF COURSE INSTALLATION Step 1 With the gate closed place the magnet holder in the rack positioned in front of the...

Страница 9: ...cessary invert the connector on the board After attaching the magnet holders make final adjustments by moving them to the right or left depending on the setting you want Step 4 To finalize the install...

Страница 10: ...Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the end of course sys...

Отзывы: