background image

WARNING:

Do not use the equipment 

without first reading the 

instruction manual.

DZ BRUTALLE

Technical Manual

P30452 - 04/2022

Rev. 1

Made by: 

Motoppar Indústria e Comércio de Automatizadores Ltda

Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil

CNPJ: 52.605.821/0001-55

www.ppa.com.br  |  +55 14 3407 1000

Содержание DZ BRUTALLE 2.0T JetFlex

Страница 1: ...ction manual DZ BRUTALLE Technical Manual P30452 04 2022 Rev 1 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17406...

Страница 2: ...ICAL CHARACTERISTICS 5 TOOLS REQUIRED FOR INSTALLATION 6 ELECTRICAL INSTALLATION 6 CARE WITH THE ELECTRICAL INSTALLATION 7 GATE CARE BEFORE AUTOMATION 8 INSTALLATION AND FIXING OF THE OPERATOR 9 ANALO...

Страница 3: ...mandatory when installing the operator TECHNICAL CHARACTERISTICS DZ BRUTALLE 3 0T Z12 Z17 TYPE OF OPERATOR Sliding MODEL JetFlex RATED VOLTAGE 127V 220V NOMINAL FREQUENCY 60 Hz RATED POWER 180W 150W E...

Страница 4: ...be a flexible cable 3 x 0 75 mm 500 V according to the NBR standard NM 247 5 The power conductor of a product for external use must be a flexible cable 3 x 0 75 mm 500 V as per the standard IEC 60245...

Страница 5: ...that uses a straight section Picture A angle presents greater friction and consequently greater wear The circular section Picture B allows for better gate displacement and less friction for the opera...

Страница 6: ...ng the set against the gate Then mark the fixing holes in the floor or concrete base 5th Step Drill holes for fixing positioning the operator aligned with the gate Before tightening the 1 2 x 4 parabo...

Страница 7: ...rew every 300 or 400 mm 8th Step If the gate leaf is warped provide wedges to ensure rack alignment There are cases where the rack will need to extend the length of the sheet In this case provide a Fr...

Страница 8: ...the operator s REED This magnet will act as the opening limit switch 3rd Step Start the engine and observe if the REED s are shutting down correctly If necessary invert the board connector Once the m...

Страница 9: ...ace fuse with same specification C Make sure there is no object blocking the gate operation D Replace the course end system analog and or digital Engine blocked A Inverted motor connection B Locked ga...

Отзывы: