background image

6

7

TOOLS REQUIRED FOR INSTALLATION

Below are some tools needed to install the operator:

ELECTRICAL INSTALLATION

For electrical installation, the network must contain the following characteristics:

- Mains 127 V or 220 V;

-Have 5 A circuit breakers in the electrical energy distribution box;

- 3/4” diameter conduits between the electrical power distribution box and the 

total shutdown device;

- 3/4” diameter conduits between the total shutdown device and the operator 

connection point;

- 1/2” diameter conduits for external and optional push buttons;

- 1/2” diameter conduits for safety photocells (optional).

-The cable for fixed wiring must comply with NBR NM 247-3;

-The power conductor, of a product for internal use, must be a 

flexible cable 3 x 0.75 mm²; 500 V, according to the NBR standard 

NM 247-5;

-The power conductor, of a product for external use, must be a 

flexible cable 3 x 0.75 mm²; 500 V, as per the standard IEC 60245-

57.

PLIERS

SAW ARCH

CANNON KEY

SCREWDRIVER

FIXED KEY

LADDER

SOLDERING MACHINE

HAMMER

LEVEL

TAPE

FRAME

DRILLING MACHINE

PENCIL

SANDER / GRINDER

CARE WITH THE ELECTRICAL 
INSTALLATION

To avoid damage to the wiring, it is important that all conductors are correctly 

attached to the operator. The passage of the wiring must be done through conduits, 

passing internally through the base of the floor, ensuring that none of the wiring 

conductors is trapped and damaged.

It is mandatory that the 

ground terminal be connected 

to the network ground cable.

IMPORTANT

The instrument must be powered via a residual differential current 

(DR) device with a rated residual operating current exceeding 30 

mA.

DISCONNECTION 

MEANS

CONDUIT

Содержание DZ BRUTALLE 2.0T JetFlex

Страница 1: ...ction manual DZ BRUTALLE Technical Manual P30452 04 2022 Rev 1 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17406...

Страница 2: ...ICAL CHARACTERISTICS 5 TOOLS REQUIRED FOR INSTALLATION 6 ELECTRICAL INSTALLATION 6 CARE WITH THE ELECTRICAL INSTALLATION 7 GATE CARE BEFORE AUTOMATION 8 INSTALLATION AND FIXING OF THE OPERATOR 9 ANALO...

Страница 3: ...mandatory when installing the operator TECHNICAL CHARACTERISTICS DZ BRUTALLE 3 0T Z12 Z17 TYPE OF OPERATOR Sliding MODEL JetFlex RATED VOLTAGE 127V 220V NOMINAL FREQUENCY 60 Hz RATED POWER 180W 150W E...

Страница 4: ...be a flexible cable 3 x 0 75 mm 500 V according to the NBR standard NM 247 5 The power conductor of a product for external use must be a flexible cable 3 x 0 75 mm 500 V as per the standard IEC 60245...

Страница 5: ...that uses a straight section Picture A angle presents greater friction and consequently greater wear The circular section Picture B allows for better gate displacement and less friction for the opera...

Страница 6: ...ng the set against the gate Then mark the fixing holes in the floor or concrete base 5th Step Drill holes for fixing positioning the operator aligned with the gate Before tightening the 1 2 x 4 parabo...

Страница 7: ...rew every 300 or 400 mm 8th Step If the gate leaf is warped provide wedges to ensure rack alignment There are cases where the rack will need to extend the length of the sheet In this case provide a Fr...

Страница 8: ...the operator s REED This magnet will act as the opening limit switch 3rd Step Start the engine and observe if the REED s are shutting down correctly If necessary invert the board connector Once the m...

Страница 9: ...ace fuse with same specification C Make sure there is no object blocking the gate operation D Replace the course end system analog and or digital Engine blocked A Inverted motor connection B Locked ga...

Отзывы: