6th Step:
With the operator unlocked, position the rack bar over the gear and
aligned with the gate.
It is necessary to leave approximately a 2mm gap between the top of the rack tooth
and the bottom of the gear tooth.
7th Step:
Fix the rack along the entire length of the gate leaf with solder or screw
every 300 or 400 mm.
8th Step:
If the gate leaf is warped, provide wedges to ensure rack alignment.
There are cases where the rack will need to extend the length of the sheet. In this
case, provide a French hand so that you do not jump your teeth when starting the
machine.
9th Step:
After fixing the rack, permanently fix the operator on the floor or concrete
base, tightening the screws permanently.