background image

Underground Swing Gate Operator

FAAC International Inc.
Headquarter & East Coast Operations
5151 Sunbeam Road
Suites 9-11
Jacksonville, FL 32257
Tel. 866 925 3222
www.faacusa.com

FAAC International Inc.

West Coast Operations

357 South Acacia Avenue

Unit 357

Fullerton, CA 92831

Tel. 800 221 8278

770

Содержание 770 COMPACT

Страница 1: ...onal Inc Headquarter East Coast Operations 5151 Sunbeam Road Suites 9 11 Jacksonville FL 32257 Tel 866 925 3222 www faacusa com FAAC International Inc West Coast Operations 357 South Acacia Avenue Uni...

Страница 2: ...tion Instructions 3 General Safety Precautions 4 UL325 Gate Operator Classifications 5 Installing the Warning Signs 5 1 DESCRIPTION CHARACTERISTICS 6 2 STANDARD INSTALLATION LAYOUT 6 3 INSTALLING THE...

Страница 3: ...r Reset buttons must be located within line of sight of the gate Activation of the reset control shall not cause the operator to start 7 All warning signs and placards must be installed and easily see...

Страница 4: ...easonable use If a gate system component malfunctions disconnect the main power before attempting to repair it Do not impede the movement of the gate you may injure yourself or damage the gate system...

Страница 5: ...dings such as factories loading docks or other locations not intended to service the general public RESTRICTED ACCESS VEHICULAR GATE OPERATOR CLASS IV A vehicular gate operator system intended for use...

Страница 6: ...lding has to be done on the gate complete it before installing the automation system Fig 1 2 STANDARD INSTALLATION LAYOUT Fig 2 3 2 INSTALLING THE LEAF SUPPORTING FOUNDATION BOX Fig 3 a For Existing G...

Страница 7: ...ions provided in Figs 6a and 6b The center of the pivot on the foundation box must be perfectly aligned with the leaf s axis of swing Figs 6a and 6b 3 Lay down a 1 5 inch diameter PVC tube through whi...

Страница 8: ...the driving levers supplied as shown in Fig 13 Note grease the operator pinion and the fixing pivots of the two levers 4 Install the second operator if required by repeating the opera tions described...

Страница 9: ...til the lock is engaged in the locking bracket Fig 16 Ref 3 4 Close the lid on the lock 7 RETURNING TO NORMAL OPERATION 8 MAINTENANCE Fig 16 9 REPAIRS 1 Program the electronic control unit according t...

Страница 10: ...70 1 1 Y 770 24V MOTOR 002 716078 1 1 Y 770 GEAR BOX 004 727158 1 1 Y 770 GEAR BOX COVER 007 718076 1 1 Y SW G O THIRD INTERNAL SHAFT GROUP 008 719165 1 1 Y SW G O 770 INTERNAL SLOW SHAFT 010 390451 0...

Страница 11: ...of the product s or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under cond...

Отзывы: