FAAC Model 770 Underground Swing Gate Operator

At regular intervals, check the structure of the gate and 

make sure that the hinges are in perfect working order.
Periodically lubricate the pivot and ball in the support 

bracket, through the lubricating bore shown in Fig. 1- 

Ref. 13. Make sure that the pivots of the lever systems, 

the pinion and the engagement of the lock on the locking 

bracket (Fig. 1 - Ref. 5) are always well lubricated, and 

check the efficiency of the manual operation.

Whenever you perform a maintenance operation, check 

that the anti-crushing system and the safety devices 

installed on the automation system are correctly set.

Fig. 15

For repairs, refer to an authorized FAAC service center.

To restore normal operation, proceed as follows:

1.  Push the lever back into its home position (Fig. 16 - 

Ref. 1).

2.  Insert the release key into the lock and turn it as far 

as it will turn in the direction opposite the post (Fig. 

16 - Ref. 2).

3.  Operate the leaf manually until the lock is engaged 

in the locking bracket (Fig. 16 - Ref. 3).

4.  Close the lid on the lock.

7. 

RETURNING TO NORMAL OPERATION

8. MAINTENANCE

Fig. 16

9. REPAIRS

1.  Program the electronic control unit according to your 

requirements, following the relevant instructions.

2.  Connect the system to the power supply and check 

the status of the LEDs (refer to the instructions for 

the electronic control unit).

4. START-UP

5.  

TESTING THE AUTOMATION SYSTEM

Carefully test the operation of the automation system and 

of all connected accessories.
Give the customer the User’s Guide page, and show 

them the correct operation and use of the automation 

system.

6.   MANUAL OPERATION

Should the need arise to operate the gate manually 

because of a power failure or malfunction, the release 

device with key fitted on the support bracket 

(Fig. 1 - Ref. 

6) makes it possible to release the system from both the 

inside and the outside.

To operate the leaf manually, proceed as follows.

• 

Open the lid of the lock (Fig. 15 - Ref. 1).

• 

Insert the release key in the lock (Fig. 15 - Ref. 2).

• 

Turn the key in the direction of the post, as far as it 

will go (Fig. 15 - Ref. 3).

• 

Pull the lever out (Fig. 15 - Ref. 4).

• 

Operate the leaf manually.

Содержание 770 COMPACT

Страница 1: ...onal Inc Headquarter East Coast Operations 5151 Sunbeam Road Suites 9 11 Jacksonville FL 32257 Tel 866 925 3222 www faacusa com FAAC International Inc West Coast Operations 357 South Acacia Avenue Uni...

Страница 2: ...tion Instructions 3 General Safety Precautions 4 UL325 Gate Operator Classifications 5 Installing the Warning Signs 5 1 DESCRIPTION CHARACTERISTICS 6 2 STANDARD INSTALLATION LAYOUT 6 3 INSTALLING THE...

Страница 3: ...r Reset buttons must be located within line of sight of the gate Activation of the reset control shall not cause the operator to start 7 All warning signs and placards must be installed and easily see...

Страница 4: ...easonable use If a gate system component malfunctions disconnect the main power before attempting to repair it Do not impede the movement of the gate you may injure yourself or damage the gate system...

Страница 5: ...dings such as factories loading docks or other locations not intended to service the general public RESTRICTED ACCESS VEHICULAR GATE OPERATOR CLASS IV A vehicular gate operator system intended for use...

Страница 6: ...lding has to be done on the gate complete it before installing the automation system Fig 1 2 STANDARD INSTALLATION LAYOUT Fig 2 3 2 INSTALLING THE LEAF SUPPORTING FOUNDATION BOX Fig 3 a For Existing G...

Страница 7: ...ions provided in Figs 6a and 6b The center of the pivot on the foundation box must be perfectly aligned with the leaf s axis of swing Figs 6a and 6b 3 Lay down a 1 5 inch diameter PVC tube through whi...

Страница 8: ...the driving levers supplied as shown in Fig 13 Note grease the operator pinion and the fixing pivots of the two levers 4 Install the second operator if required by repeating the opera tions described...

Страница 9: ...til the lock is engaged in the locking bracket Fig 16 Ref 3 4 Close the lid on the lock 7 RETURNING TO NORMAL OPERATION 8 MAINTENANCE Fig 16 9 REPAIRS 1 Program the electronic control unit according t...

Страница 10: ...70 1 1 Y 770 24V MOTOR 002 716078 1 1 Y 770 GEAR BOX 004 727158 1 1 Y 770 GEAR BOX COVER 007 718076 1 1 Y SW G O THIRD INTERNAL SHAFT GROUP 008 719165 1 1 Y SW G O 770 INTERNAL SLOW SHAFT 010 390451 0...

Страница 11: ...of the product s or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under cond...

Отзывы: