![PP Systems CIRAS-3 Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/pp-systems/ciras-3/ciras-3_operating-manual_1592668066.webp)
CIRAS-3 Operation Manual V. 1.09
66
Section 6. Startup Routine and System Stability
Checks
Before You Power Up CIRAS-3
The time required to be up and running from when you power on CIRAS-3 to when you make your first
measurement is reasonably short. Much of the pre-operation phase depends on the how well you
maintain chemicals. But there are a few other important considerations. The most basic pre-operational
checklist can be summarized by these items:
•
Be sure that the chemicals are fresh and not exhausted.
•
Check that the leaf chamber gaskets are in good condition and replace them if they are
compressed, damaged, or dirty.
•
Be sure there is sufficient battery power for field operation. For optimal performance, we
recommend charging the internal CIRAS-3 Li-ion battery(s) the night prior to field
measurements using the power supply adapter provided. The indicating LED on the
CIRAS-3 console will be a steady green when connected to the charger/power supply.
The actual state of the battery can be viewed in the lower right hand corner of the display
when powered on.
•
Make all necessary electrical connections of cuvettes, accessories and other components
•
If working at high ambient temperatures (>35-40
o
C), we recommend shading the console
to prevent overheating.
•
Keep the CIRAS-3 on its power supply adapter during warm up to preserve the battery.
•
If using a CO
2
cartridge, make sure that one is in place with enough capacity to get you
through your measurements. See
on page 68.