18
-
2. Parallel installation
1) Users need to opt a standard 25-pin communication cable,
which should have 25 cores, corresponding stitches and shield,
as the UPS parallel cable. The length of the parallel cable is
appropriate to be less than 3 m.
2) Strictly follow the stand-alone wiring requirement to perform the
input wiring of each UPS.
3) Connect the output wires of each UPS to an output breaker
panel.
4) Disconnect the Jumper on JP1 and JP2 of the terminal block
first, and connect each output breaker to a main output breaker
and then to the loads.
5) Each UPS need an independent battery pack.
6) Please refer to the wiring diagram in the next page, and opt
suitable breaker.
■
The requirement of the output wiring is as follows:
●
When the distance between the UPS in parallel and the
breaker panel is less than 20 meters, the difference between
the wires of input & output of the UPS is required to be less
than 20%.
●
When the distance between the UPS in parallel and the
breaker panel is greater than 20 meters, the difference
between the wires of input & output of the UPS is required
to be less than 10%.
Содержание 10KT
Страница 23: ...Wiring diagram of 6KT XL 0KT XL 1 parallel system...
Страница 24: ...Wiring diagram of 3C 1 KT XL 0 parallel system...
Страница 25: ...Wiring diagram of 3C 15KT XL 20KT XL parallel system 3C...
Страница 48: ...STEP 5 The output voltage would be 230VAC after the UPS is turned on...
Страница 50: ...DB 9 Interface of AS400 communication protocol...
Страница 53: ...Appendix 2 Rear Panel Back view of 6KVA Back view of 6KVA XL Back view of 10KVA Back view of 10KVA XL...
Страница 54: ...10KVA Back View of 31 Back View of 31 20KVA...
Страница 55: ......