14
-
7)
After having completed the installation, make sure the wiring is
correct.
8) Please install the output breaker between the output terminal
and the load, and the breaker should with leakage current
protective function if necessary.
9) To connect the load with the UPS, please turn off all the loads
first, then perform the connection and finally turn on the loads
one by one.
10) No matter the UPS is connected to the utility power or not, the
output of the UPS may have electricity. The parts inside the
unit may still have hazardous voltage after turning off the UPS.
To make the UPS have no output, power off the UPS, and then
disconnect the utility power supply.
11) Suggest charging the batteries for 8 hours before use. After
connection, turn the input breaker in the
“
ON
”
position, the
UPS will charge the batteries automatically. You can also use
the UPS immediately without charging the batteries first, but
the backup time may be less than the standard value.
12) If it is necessary to connect the inductance load such as a
monitor or a laser printer to the UPS, the start-up power should
be used for calculating the capacity of the UPS, as its start-up
power consumption is too big when it is started.
Important notes:
If the UPS is used in single mode, JPI and JP2
must be connected by 10AWG(6mm
2
). If the UPS is used in parallel
mode, JP1 and JP2 must be disconnected.
Input and output Terminal Block wiring diagram of 6KT-XL/10KT-XL
Содержание 10KT
Страница 23: ...Wiring diagram of 6KT XL 0KT XL 1 parallel system...
Страница 24: ...Wiring diagram of 3C 1 KT XL 0 parallel system...
Страница 25: ...Wiring diagram of 3C 15KT XL 20KT XL parallel system 3C...
Страница 48: ...STEP 5 The output voltage would be 230VAC after the UPS is turned on...
Страница 50: ...DB 9 Interface of AS400 communication protocol...
Страница 53: ...Appendix 2 Rear Panel Back view of 6KVA Back view of 6KVA XL Back view of 10KVA Back view of 10KVA XL...
Страница 54: ...10KVA Back View of 31 Back View of 31 20KVA...
Страница 55: ......