Supplied By www.heating spares.co Tel. 0161 620 6677
12
INSTALLATION - REAR FLUE
Manual No. 405/0101
INSTALLATION - REAR FLUE - PAGE 12
3.5
REAR FLUE - FIT THE FLUE/TERMINAL ASSEMBLY
Refer to Figs. 11 and 12.
Note:
As the flue/terminal assembly is not physically secured
to the boiler or wall mounting plate, the outer wall plate and
outer sealing plate must be used to secure the flue/terminal
assembly to the wall.
1.
Fit the outer wall plate, supplied with the flue/terminal
assembly, over the flue/terminal assembly as shown in
Fig. 11.
2.
From outside the building insert the flue/terminal
assembly into the wall and carefully push it fully home.
3.
If necessary make good the outside wall around the flue
duct.
4.
Place the outer sealing plate assembly, supplied with the
flue/terminal assembly, over the terminal as shown in Fig.
12 and mark the position of the four fixing holes.
5.
Remove the sealing plate and drill and plug the holes,
suitable for 1” lg. No.8 woodscrews.
Note:
The terminal should be covered before drilling to
prevent debris entering the terminal.
6.
Remove any covering from the terminal. Position the
sealing plate over the terminal and secure it to the wall
with four 1” lg. No.8 screws, supplied with the
flue/terminal assembly.
Fig. 11
Fig. 12
3.6
REAR FLUE - PREPARE AND FIT THE BOILER
Refer to Figs. 13 and 14.
1.
Disconnect the flexible pipe connection to the bottom of the expansion vessel, take care not to lose the washer.
Remove the two screws securing the expansion vessel support frame to the inner case front panel. Holding the vessel
and frame swing them out to clear the boiler. Remove the frame and vessel from the boiler by lifting the frame out of its
bottom pivoting point. See Fig. 13. Cut the foam seal in two and stick onto the inner case
Fig. 13