10 INSTALLATION
Manual No. 405/0101
3. INSTALLATION - PAGE 10
3.1
UNPACK THE BOILER
Refer to Fig. 6.
1.
Carefully unpack the boiler.
2.
Do not discard any packaging until all the items are
accounted for, see Fig. 6.
3.
Place the case pack and foam seal to one side so as not
to damage the case parts before fitting them. See Fig. 29
for case parts.
4.
Check that the boiler fixings pack contains:-
Four No.8 x 12 lg. c'sk hd. screws.
Six No.6 x 10 lg. pan hd. screws.
Two M4 x 10 lg. c'sk hd. screws.
Four M6 x 10 lg. hex. hd. screws.
One 22 mm nut and olive.
Two 28 mm nuts and olives.
Fig. 6
3.2
UNPACK THE FLUE TERMINAL
Refer to Fig. 7.
1.
Carefully unpack the flue/terminal assembly.
2.
Do not discard any packaging until all the items are
accounted for, see Fig. 7.
3.
Bend the cutting jig to shape as shown in Fig. 7. The jig is
easily bent by hand.
Fig. 7