Sirius FS
54
GB/IE
7.3.3 OCI345 - LPB Communications Bus
-
See Section 7.2 (items 3 & 5) for access to electrical components
- Carefully remove connectors
Screw
Connector
Screw
- Undo the nuts securing the LPB onto the metal panel
- Lift LPB from panel
- Replacement is the reverse
7.3.4 LMS14 Interface PCB
-
See Section 7.2 (items 3 & 5) for access to electrical components
- Carefully pull off all connectors on the PCB
- Undo the one nut providing earthing to the PCB.
Earthing post
PCB Supports
Fault delay adjustment
- Release the 3 PCB supports by pinching the end of each pillar with a pair
of pliers and slowly withdraw the PCB from the supports
- Replacement is the reverse
- Set fault delay using the adjustable pot (0 - 10 minutes)
7.3.5 Control Relays
-
See Section 7.2 (items 3 & 5) for access to electrical components
-
Remove the relay by pushing the release bar upwards
- Fit new relay (note pin alignment) by gently pushing the relay into the
holder. When correctly fitted the release bar can be returned to its original
position
Содержание SIRIUS FS
Страница 14: ...Sirius FS 12 GB IE 3 4 WIRING DIAGRAM PCB 1 ...
Страница 15: ...Sirius FS 13 GB IE 3 4 WIRING DIAGRAM PCB 2 ...
Страница 23: ...Sirius FS 21 GB IE 4 6 1 3 BASIC HEATING CIRCUIT HC1 HC2 DHW 4 6 1 4 BASIC HEATING CIRCUITS HC1 HC2 DHW SOLAR ...
Страница 45: ...Sirius FS 43 GB IE 6 5 3 Setting the Time and Date ...
Страница 64: ...Sirius FS 62 GB IE 7 5 COMPONENT ILLUSTRATIONS 25 2 37 36 35 23 24 23 24 38 39 28 28 33 33 38 39 44 42 43 ...
Страница 65: ...Sirius FS 63 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 11 10 19 17 17 16 34 17 12 19 ...
Страница 66: ...Sirius FS 64 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 30 29 8 13 18 5 1 3 4 32 21 15 14 7 9 20 6 ...
Страница 69: ...Sirius FS 67 GB IE 7 6 3 First Aid Kit Parts List continued 13 1 5 31 25 33 28 20 43 42 10 18 24 23 44 15 ...