After installation of the pipe work and fittings, open the main water supply valve, flush the
system and fill the boiler and its heating circuits. The boiler should be commissioned utilising
the heating circuit.
6.1 SWITCHING ON
Turn on the switched spur supplying electricity to the boiler.
Open the front facia flap and turn on the boiler. The display should then proceed with
system start up checks, which may take several minutes. When the boiler has finished
these checks, it should be displaying the default screen “Cascade flow temperature”, on
the left hand side HMI display screen. The right hand HMI display screen should be
displaying “Boiler temperature”.
6.2 ENGINEERS TOOLS AND USE OF CONTROLLER STOP
6.0 COMMISSIONING
Содержание SIRIUS FS
Страница 14: ...Sirius FS 12 GB IE 3 4 WIRING DIAGRAM PCB 1 ...
Страница 15: ...Sirius FS 13 GB IE 3 4 WIRING DIAGRAM PCB 2 ...
Страница 23: ...Sirius FS 21 GB IE 4 6 1 3 BASIC HEATING CIRCUIT HC1 HC2 DHW 4 6 1 4 BASIC HEATING CIRCUITS HC1 HC2 DHW SOLAR ...
Страница 45: ...Sirius FS 43 GB IE 6 5 3 Setting the Time and Date ...
Страница 64: ...Sirius FS 62 GB IE 7 5 COMPONENT ILLUSTRATIONS 25 2 37 36 35 23 24 23 24 38 39 28 28 33 33 38 39 44 42 43 ...
Страница 65: ...Sirius FS 63 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 11 10 19 17 17 16 34 17 12 19 ...
Страница 66: ...Sirius FS 64 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 30 29 8 13 18 5 1 3 4 32 21 15 14 7 9 20 6 ...
Страница 69: ...Sirius FS 67 GB IE 7 6 3 First Aid Kit Parts List continued 13 1 5 31 25 33 28 20 43 42 10 18 24 23 44 15 ...