Sirius FS
34
GB/IE
5.5.3 B
23
Flue - Ventilation Requirements
R
efer to BS 6644 clause 19 and BS 5440 part 2 for detailed recommendations.
The room in which an boiler is installed must have a permanent air vent to outside air
or to a room which itself has direct access to outside air. Installations in boiler rooms
require permanent vents for air supply purposes, one at high level and one at low level,
direct to outside air. The minimum free areas required are as follows:-
Where the boiler is to installed in a compartment, permanent air vents are required at high
and low level. These air vents must either connected with a room or internal space, or be
direct to outside air. The minimum free air requirements in the compartment are as follows:-
A compartment containing an open-flued appliance shall be labelled as follows:
IMPORTANT
:
Do not block the vents. Do not use the compartment for storage
.
5.5.4 B
23
Flue - Ventilation Seasonal Adjustments
Where a boiler is to operate in summer months, the above allowance should be sufficient,
provided it does not operate for more than 50% of the time. If the boiler is to be operated at
75% then an additional 1cm
2
will be required per kW at low and high level. If the boiler is to
be operated 100% of the time during the summer, an additional 2cm
2
free-area per kW will
be required at low and high level.
Position of
Air Vents
Air from room or Internal Space
Air direct from Outside
High Level
Low Level
400 = 4,500 cm ²
525 = 5,500 cm
2
400 = 9,000 cm ²
525 = 11,000cm
2
400 = 2,250 cm
2
525 = 2,750 cm
2
400 = 4,500 cm
2
525 = 5,500 cm
2
Position of air vents
Area of free air required
Low Level
High Level
400 = 1,800 cm ²
525 = 2,200 cm
2
400 = 900 cm ²
525 = 1,100cm
2
Содержание SIRIUS FS
Страница 14: ...Sirius FS 12 GB IE 3 4 WIRING DIAGRAM PCB 1 ...
Страница 15: ...Sirius FS 13 GB IE 3 4 WIRING DIAGRAM PCB 2 ...
Страница 23: ...Sirius FS 21 GB IE 4 6 1 3 BASIC HEATING CIRCUIT HC1 HC2 DHW 4 6 1 4 BASIC HEATING CIRCUITS HC1 HC2 DHW SOLAR ...
Страница 45: ...Sirius FS 43 GB IE 6 5 3 Setting the Time and Date ...
Страница 64: ...Sirius FS 62 GB IE 7 5 COMPONENT ILLUSTRATIONS 25 2 37 36 35 23 24 23 24 38 39 28 28 33 33 38 39 44 42 43 ...
Страница 65: ...Sirius FS 63 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 11 10 19 17 17 16 34 17 12 19 ...
Страница 66: ...Sirius FS 64 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 30 29 8 13 18 5 1 3 4 32 21 15 14 7 9 20 6 ...
Страница 69: ...Sirius FS 67 GB IE 7 6 3 First Aid Kit Parts List continued 13 1 5 31 25 33 28 20 43 42 10 18 24 23 44 15 ...