Sirius FS
49
GB/IE
Heat Exchanger
Inspect the condition of the heat exchanger for signs of damage. If necessary,
clean the heat exchanger using a suitable stiff nylon brush. Vacuum out any large
particles and flush the heat exchanger with fresh water. For stubborn deposits,
white vinegar can be applied to the coils (with a hand spray gun) and left for 3 mins.
Use a stiff nylon brush to remove deposits and then flush coils with plenty of fresh
water, until the water flowing from the condensate drain is clear.
Do not use any liquid except white vinegar to clean the heat exchanger, as this may
result in heat exchanger damage and invalidate the manufacturers warrantee.
Siphon
Remove siphon trap at the rear of the boiler. Remove the bowl and clean out any
deposits, refill the bowl and replace siphon. The condense system can then be
tested by pouring clean water into the heat exchanger. The water should exit
through the siphon.
Fan
Inspect impeller and if necessary clean carefully with a soft brush to remove the
build up of dust particles. Be careful when cleaning the fan to avoid force which
may cause the fan to become unbalanced.
It is recommended that the following actions should be carried out after the above checks
have been completed, the boiler has been re-assembled and reconnected to the electrical
and gas supply :-
Flue gas piping
Inspect flue piping for gas tightness, damage, correct support and traces of water
leaking from these pipes. Check if there is any condensate leaking from the flue pipe
work.
Gas supply piping
Inspect the gas supply pipe work and ensure that is gas tight, undamaged, correctly
supported and installed according to regulations in force. When the boiler is in
operation, check that there is sufficient gas pressure available to operate the boiler
safely.
Combustion analysis
Run each burner individually on both maximum and minimum output, to check that
the boiler is modulating correctly and that the CO and CO
2
readings are correct. Refer
to section 6.4 (P40), for full details on how to check and adjust CO
2
levels.
Function Check
Run the boiler through a full heating / DHW cycle and note any operational errors.
Ensure that all errors are corrected before completing any maintenance / servicing.
Содержание SIRIUS FS
Страница 14: ...Sirius FS 12 GB IE 3 4 WIRING DIAGRAM PCB 1 ...
Страница 15: ...Sirius FS 13 GB IE 3 4 WIRING DIAGRAM PCB 2 ...
Страница 23: ...Sirius FS 21 GB IE 4 6 1 3 BASIC HEATING CIRCUIT HC1 HC2 DHW 4 6 1 4 BASIC HEATING CIRCUITS HC1 HC2 DHW SOLAR ...
Страница 45: ...Sirius FS 43 GB IE 6 5 3 Setting the Time and Date ...
Страница 64: ...Sirius FS 62 GB IE 7 5 COMPONENT ILLUSTRATIONS 25 2 37 36 35 23 24 23 24 38 39 28 28 33 33 38 39 44 42 43 ...
Страница 65: ...Sirius FS 63 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 11 10 19 17 17 16 34 17 12 19 ...
Страница 66: ...Sirius FS 64 GB IE 7 5 COMPONENT ILLUSTRATIONS CONTINUED 30 29 8 13 18 5 1 3 4 32 21 15 14 7 9 20 6 ...
Страница 69: ...Sirius FS 67 GB IE 7 6 3 First Aid Kit Parts List continued 13 1 5 31 25 33 28 20 43 42 10 18 24 23 44 15 ...