17
Fig. 1-12. Set of measurement and treatment agents
PART 2 – INSTALLATION MANUAL
2.1. Transport
The bath should only be transported in the original manufacturer’s packaging! After unpacking, the
bath can be carried by the aluminium frame or acrylic elements. The pipes and cables must not be
used as handles/grips!!!
2.2. Site preparation
The portable Victoria SPA may be operated both indoors and outdoors. The site for the bath
should comply with the following conditions:
a)
the proper area and the proper transportation routes (in case of closed premises),
b)
230V electrical supply and ensured effi ciency of the electrical connection in respect of the equip-
ment (for standard equipment the rated power consumption is 5kW and requires use of a 3x2,5 mm
2
electrical cable as the connection – with regard to the safety of the users, in all cases the supply
cable must be protected by means of a differential-current switch with the standard rated switch off
current of 30 mA),
c)
water supply and drainage,
d)
levelled fl oor,
e)
suffi cient ventilation (indoors),
f)
in case of a bath installed in closed premises, access to the electrical equipment must be provided
for maintenance or inspection purposes.
2.3. Bath positioning
1765
1580
660
600
260
440
In order to ensure proper operation conditions, the fl oor
should be very well levelled. All the bath legs should be on
a solid and hard surface. The total weight of the bath with
water and four people is about 1450 kg. The weight of the
bath should be equally spread over the 11 bath legs. The
surface load is 582 kg/m
2
.
Fig. 2-1. Location of bath points of support for
SPA Victoria
Содержание VICTORIA SPA
Страница 1: ...SPA Bath VICTORIA SPA 178 Installation and user manual...
Страница 24: ...24 Notes...
Страница 25: ...25 Notes...
Страница 26: ...26 Notes...