Page 5
INSTALLATION
1)
Remove the 3 covers from the main control board.
2)
Position the main controller on top of the fan coil unit or on the
supply air duct and secure.
3)
Connect the 24VAC power supply to the terminals N + L on the main
controller board. When turning on the power, the red LED will
illuminate to show that the main controller is ready.
3)
Mount the supply air sensor in the supply air duct upstream from the
motorised dampers. Plug the sensor into the socket on the main
controller board.
4)
Connect the battery by plugging into the socket on the main
controller board.
5)
Use two pre-tested data cables to connect the main controller
(touchpad 1-8 socket) and a touchpad via a double left latched
adaptor, as shown in Figure 2. The LCD on the
touchpad should show the clock after setting a
unique address to the touchpad. (Refer to the
commissioning section) Otherwise, check the
connection and the cables.
SENSOR SOCKET
TOUCHPAD 1-8
TOUCHPAD 9-16
LED
24 VAC
VAV DAMPERS
BYPASS DAMPER
BATTERY CONNECTOR
BATTERY